LAT  Electronics, Data Acquisition & Instrument Flight Software

  Subsystem Manager:  Gunther Haller

 

Important: EM2 test-stand hardware components are NOT compatible with hardware supplied for EM1 test-stands. Do not mix TEM/TEM-PS/Transition Card EM1 with EM2 hardware. Hardware for EM2 is marked "EM2" on the TEM, TEM-PS, VME Transition Card and LCB supplied.

I&T:

EM2: EGSE- Teststand #1 (in Selim's office)

EM1: EGSE- Teststand #a (in building 33)

other EM1's?

EM2: TEM/TPS on Mini-Tower

EM1: TEM/TPS on full engineering model CAL at NRL, to be replaced with EM2 TEM/TPS once SLAC sends extra EM2 TEM

to be delivered:

Two more EM2's

 

DAQ:

EM2: on fully elex instrumented (no detectors) tower in CL

TEM test-station in CL

Burn-in test station in CL

TPS test-station (no TEM, but SBC)

Thermal Vacuum station

DAQ Burn-in Test-station in Building 33

Test-bed: 16 TEM/TPS

others in FSW/test-lab

 

to be built:

EM2 test-station for TEM assembly company

TPS test-station for TPS assembly company (no TEM, but SBC)

EM2 test-station for ASIC qualification at GSFC (no TEM/TPS)