Important: EM2 test-stand hardware components are NOT compatible with hardware supplied for EM1 test-stands. Do not mix TEM/TEM-PS/Transition Card EM1 with EM2 hardware. Hardware for EM2 is marked "EM2" on the TEM, TEM-PS, VME Transition Card and LCB supplied.
I&T:
EM2: EGSE- Teststand #1 (in Selim's office)
EM1: EGSE- Teststand #a (in building 33)
other EM1's?
EM2: TEM/TPS on Mini-Tower
EM1: TEM/TPS on full engineering model CAL at NRL, to be replaced with EM2 TEM/TPS once SLAC sends extra EM2 TEM
to be delivered:
Two more EM2's
DAQ:
EM2: on fully elex instrumented (no detectors) tower in CL
TEM test-station in CL
Burn-in test station in CL
TPS test-station (no TEM, but SBC)
Thermal Vacuum station
DAQ Burn-in Test-station in Building 33
Test-bed: 16 TEM/TPS
others in FSW/test-lab
to be built:
EM2 test-station for TEM assembly company
TPS test-station for TPS assembly company (no TEM, but SBC)
EM2 test-station for ASIC qualification at GSFC (no TEM/TPS)