GLAST The Gamma Ray Large Area Space Telescope

T&DF System Test Group

GASU Test Procedures

  • For each new GASU, run the complete list of procedures.
  • For a conformal coated GASU, run procedures 6 through 10.

GASU Power Supply

  1. LAT-TD-04814 Electrical Interface Continuity and Isolation, GASU Power Supply
  2. LAT-TD-01727 GASU Power Supply Unit (GPSU) Performance Test Procedure
  3. LAT-TD-04813 Interface Verification Test, GASU Power Supply

GASU

  1. LAT-TD-06851 GASU DAQ Connection to Power Supply, Interface Verification Test
  2. LAT-TD-06940 GASU DAQ Performance Test with Lab Supply
  3. LAT-TD-06888 GASU Power Supply ACD Power Test Procedure
  4. LAT-TD-06610 GASU Electrical Interface Continuity and Isolation Test (Automated)
  5. LAT-TD-04382 GASU Stray Voltage Test (SVT) Procedure - Automated
  6. LAT-TD-01717 GASU Test Procedure (LPT and CPT)
  7. LAT-TD-03633 GLAST LAT GASU EMI Acceptance Test Procedure
  8. LAT-TD-03635 Thermal Vacuum Procedure, GASU

Other Procedures

LAT-TD-07108 EMI Test Procedure for GASU
LAT-TD-04260 Electrical Interface Continuity and Isolation Test, GASU (Manual)