Document #

Date Effective

LAT-TD-07751-01

13 December 2005

Prepared by(s)

Supersedes

Gunther Haller

 

GLAST LAT Technical Note

Jeffrey S. Ludvik

 

Subsystem/Office

Electronics & DAQ Subsystem

Document Title

HCB Crate Assembly #3 GLAT2438 Acceptance Test Data Package

 

 

Gamma-ray Large Area Space Telescope (GLAST)

Large Area Telescope (LAT)

Electronics & DAQ Subsystem

 

Acceptance Test Data Package

HCB Crate Assembly #3

GLAT2438

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DOCUMENT APPROVAL

 

Prepared by:

 

 

 

 

 

Jeffrey Ludvik
LAT Electronic Engineer

 

Date

Approved by:

 

 

 

 

 

Gunther Haller
Electronics & DAQ Subsystem Manager

 

Date

 

 

 

Dave Nelson
LAT DAQ/Electronic Engineer
 

 

Date

 

 

 

Leonid Sapozhnikov
LAT DAQ/Electronic Engineer
 

 

Date

 

 

 

Joe Cullinan
Quality Assurance
 

 

Date

 

 

 



 

 

Date


 

LAT Acceptance

 

 

 

 

Dick Horn
LAT Deputy Project Manager

 

Date

 

 

 

Pat Hascall
LAT System Engineer

 

Date

 

 

 

Elliott Bloom
LAT Integration and Test

 

Date

 

 

 

Joe Cullinan
LAT Mission Assurance

 

Date

 

 

 

Other

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

CHANGE HISTORY LOG

 

Revision

Effective Date

Description of Changes

01

13 December 2005

Initial Draft

 

 

 

 

 

 

 

 

 

 

 

 


 

 1         PURPOSE

The purpose of this Technical Note is to document the contents of the Acceptance Test Data Package (ATDP) for the DAQ Electronics (DAQ) subsystem.  The contents of this document have been coordinated between LAT Integration, Test, and Calibration (IT&C), LAT Systems Engineering (SE), and LAT Quality Assurance (QA).

 

2         Identification

Item Description:

LAT HCB Crate Assembly #3 Module – GLAT2438 - LAT-DS-02137-53

Identification

Part/Drawing Number

Serial Number

HCB

LAT-DS-02137

GLAT2438

 


 

3         Certificates of Compliance

 

MECHANICAL SUMMARY DATA

Mechanical Lead:

Dave Nelson

 

ITEM:

REMARKS:

 

Structural Analysis reviewed and acceptable

Not Required

 

Structural Tests reviewed and acceptable

Not Required

 

Open Items from tests performed or from meetings with SLAC

None

 

Mass (Measured)

The maximum HCB assembly mass allocation is 1.6 kg/3.52 lbs. LAT-PS-07373-01, Sec. 4.1.1

1.35 kg, Complies

 

As Run Mass Measurement Procedure

LAT-PS-07373-01

 

Mass (Mass Survey)

Not Performed

 

Mass / Center of Mass Report - Analysis

Not Performed - Qual only

 

Dimensions

NA

 

Interface flatness and surface finish

NA

 

Dimension Inspection Report

Done at box level assy listed below

 

Final visual inspection prior to shipping to SLAC, performed at GTC

WO in GTC test binder under NCR, Archived at SLAC in Bldg. 33 Flight Store

 

ELECTRICAL SUMMARY DATA

 

Electrical Lead:

Gunther Haller

 

DESCRIPTION:

REMARKS:

 

Power consumption (28V, 25 deg C, full activity, all primary LEDs illuminated on tester box) HCB Crate Unit.

28 V * 0.963 A = 26.964 W

 

Part List reviewed and acceptable

Archived at SLAC, Bldg. 33 Flight Store

 

Electrical Test reviewed and acceptable

Archived at SLAC, Bldg. 33 Flight Store

 

Open Items from previous reviews / meetings / tests

None

 

Power consumption Report

NA

  Start-up Voltage Profile NA
  Start-up Current Profile NA

 

 

 

 

PRODUCT ASSURANCE DATA

 

Quality Lead Engineer:

Joe Cullinan

 

DESCRIPTION:

REMARKS:

 

Non-conformance report summary

HCB_CRATE_GLAT2438_SLAC_Summary_Report

Archived at SLAC, Bldg. 33 Flight Store

 

Open NCRs

See NCR List Below

 

Traceability of unit pedigree

Available in SOW, WO from Aeroflex. Archived at SLAC, Bldg. 33 Flight Store

 

Photographic Record

Online and Archived at SLAC, Bldg. 33 Flight Store

SLAC Records

 

Inspection records

Archived at SLAC, Bldg. 33 Flight Store

 

Storage, handling, shock records

Archived at SLAC, Bldg. 33 Flight Store

 

WO list

WO#1749

 

All operations, inspections, and tests have been completed per procedures as indicated on WO (signed and dated)

WOs Archived at SLAC, Bldg. 33 Flight Store

 

All operations performed to released and controlled procedures

Documents available online in LAT-docs database

 

Chronological history is up-to-date and reflects each major action that has transpired

WOs Archived at SLAC, Bldg. 33 Flight Store

 

Identity of manufacturers, part numbers, and serial number are correct

Archived at SLAC, Bldg. 33 Flight Store

 

All Non Conformance Reports, Material Review Board Reports, and failure reports are closed and accepted as per internal procedures

NCRs Archived at SLAC, Bldg. 33 Flight Store

 

Materials and processes used in the hardware are approved and acceptable

Archived at SLAC, Bldg. 33 Flight Store

 

Test logbooks, including operating time and cycle records, are complete and meet specified requirements

Log books and WOs Archived at SLAC, Bldg. 33 Flight Store 

 

All test data including deviations have been approved and stamped by the test engineer and Quality Assurance

WOs and reports Archived at SLAC, Bldg. 33 Flight Store

 

Inspection performed for physical damage (such as scratches or dents) and for cleanliness

No appreciable damage to interfaces.  Unit cleaned prior to shipment.

 

Connectors and pins examined for evidence of damage or contamination

No evidence of damage or contamination. Refer to Mate/Demate Log

 

All environmental test data and results meet specifications

No exceptions

 

 


 

 

 

ENVIRONMENTAL TEST SUMMARY DATA

System Engineer:

Dave Tarkington

Vibration Test

LAT-TD-03648-01, as run available on file

Summary Report

HCB_CRATE_GLAT2438_Vibration_Report

Requirement

LAT-SS-00778 Criteria

Pass / Fail

  Random Vibration

Table 27, Section 9.1

Acceptance (FM)

Pass

 

 

 

 

 

 

 

 

 

 

ENVIRONMENTAL TEST SUMMARY DATA

System Engineer:

Leonid Sapozhnikov

Thermal Cycle

WO#1794, GLAT2438, as run available on file

Summary Report

HCB_CRATE_GLAT2438_Therm_Report_Env_Data

Requirement

WO#1794, Step 80

Pass / Fail

  Follow Profile

WO1794, Step 80

5 cycles, –40°C to +55°C

Pass

 

 

 

ENVIRONMENTAL TEST SUMMARY DATA

System Engineer:

Roger Williams

Thermal Vacuum Test

LAT-TD-03648-01, as run available on file

Summary Report

HCB_CRATE_GLAT2438_TVAC_Data
HCB_CRATE_GLAT2438_TVAC_Profile_Data

LAT T&DF Test Plan

LAT-TD-00296 Criteria

Pass / Fail

Survival Temperature

LAT-TD-03631

–40°C to +60°C (QM)

Pass

Operational Temperature

LAT-TD-03631

–35°C to +50°C (FM)

Pass

Hot Turn On (Acpt)

LAT-TD-03631

+50°C

Pass

Cold Turn On (Acpt)

LAT-TD-03631

–40°C

Pass

 

 

 

 

 

 


 

ENVIRONMENTAL TEST SUMMARY DATA

System Engineer:

Dave Nelson

 

EMI/EMC Test

LAT-TD-03647-01, as run available on file

 

Summary Report

EMI/EMC_Data

 

  Requirement

  LAT-SS-00778-03

Pass / Fail

 

  CE102

  Conducted Emissions, Power Leads

Figure 12

Pass

 

  CS102

  Conducted Susceptibility, Power Leads

Figure 24

Pass

 

 

 

 4         Unit Performance Data

4.1        Requirements Verification

4.1.1       Performance Requirements and Verification Matrix

 
	The HCB specification doc is LAT-TD-02531

	LAT-SS-00715 Specification and ICD, Thermal Control System
        
        	Verification Matrix
 
LAT-MD-08398-01       DC Voltage Tolerance

4.1.2       Performance Versus Test Phase


CPT - Comprehensive Performance Test
 

Data Available Online

Phase

Test

Date

Summary Status

Report

HCB CCA

EICIT

1/18/06

Pass

LAT-TD-7176-01. Report available on file at SLAC.

HCB CCA

SVT

1/18/06

Pass

LAT-TD-7176-01. Report available on file at SLAC.

HCB CCA

CPT

1/18/06

Pass

LAT-TD-02532-03. Report available on file at SLAC.

HCB Crate Post-Thermal Test

CPT

1/19/06

Pass

LAT-TD-02532-03. Report available on file at SLAC.

HCB Crate Vibe Test

NA

1/25/06

Pass

LAT-TD-06101-01. Report available on file at SLAC.

Post Vibe HCB Test

CPT

1/26/06

Pass

LAT-TD-02532-03. Report available on file at SLAC.

TVAC Test

CPT

2/26/06

Pass

LAT-TD-07644-01. Report available on file at SLAC.

Post TVAC Test

CPT

3/7/06

Pass

LAT-TD-02532-03. Report available on file at SLAC.

EMI/EMC Test (SLAC)

CPT

3/24/06

Pass

LAT-TD-07456-03. Report available on file at SLAC.

Mass Measurement

NA

1/25/06

Pass

WO1784, Step 125

 

 

The TEM/TPS Comprehensive Performance Test (CPT) was run continuously during entire TVAC.

Thermal Vacuum procedure LAT-TD-07644-01.

Thermal Vac Data available at:   GLAT2438_TV

Phase

Test

Date

Summary Status

Report

Start TVAC

CPT

2/24/06

Pass

Available online and on file.

End TVAC

CPT

2/26/06

Pass

Available online and on file.

 

 

5         Unit Support Data

5.1       Software Version Report

 

Phase

Test

LATTE Release

Test Software Release

CPS CCA

CPT

P04-10-01

V04-10-01

LCB CCA

CPT

P04-10-01

V04-10-01

SIB CCA

CPT

P04-10-01

V04-10-01

RAD750

CPT

P04-10-01

V04-10-01

Post Vibration Test

CPT

P04-10-01

V04-10-01

Post Thermal Test

CPT

P04-10-01

V04-10-01

TVAC

CPT

P04-10-01

V04-10-01

EMI/EMC Test

CPT

P04-10-01

V04-10-01

 

5.1        Mate/Demate Log

Link to Mate / De-mate Log:    HCB_CRATE_GLAT2438_Mate_Demate_Log.pdf

                                       

5.2        On-time Log with Operational Hours

Run time Summary report:     HCB_CRATE_GLAT2438_RunTimeSummary.htm