Request ID |
Item Description |
Serial # |
Disposition |
Corrective
Action |
Description of NonConformance |
00399 |
TPS Subassembly Eelectrical Interface Continuity and Isolation Test
TPS CCA |
1774, 1775, 1776, 1778 |
NA |
OPEN |
1.A hard copy of the RED LINE MASTER not generated and
controlled under the Responsible Engineer. |
00400 |
TPS Subassembly SVT
TPS CCA |
GLAT 1753 |
NA |
OPEN |
1. A hard copy of the RED LINE MASTER not generated and
controlled under the Responsible Engineer. |
00506 |
Temperature deviation during initial pump-down in TV chamber test
|
GLAT1832 GLAT1835 |
NA | OPEN | Temperature deviation during initial pump-down in TV chamber test. During this test thermo-controlling unit was commanded to +25C at the beginning of pump-down, however , if chiller did not get commanded after this point it can lockup and temperature will drift. In this case temperature went to -9C and flight hardware was not powered. This condition was automatically reseted by transition to +60C. As correction to this new version TV control software does active control during all pump-down period. |
00507 | TEM/TPS | GLAT1835 | Assigned |
(cullinan, 6/2/05) Replace locking helicoil per print. Record
lot # of helicoil on W.O. 669 for s/n GLAT 1835. OK to proceed to I&T testing. Helicoil must be installed prior to integration of GLAT 1835 into Grid. Report completion of helicoil installation to this NCR. |
IS: Helicoil (#8-32) was removed during dissassembly of the
TEM/TPS module from the T/V test plate
|