LAT Integration and Test

Integration, Facilities, Configuration, and Test (IFCT) Department


SLAC

GLAST LAT  

Integration & Test

Integration Facilities Configuration Test (IFCT)


I&T Tests:

I&T Test Planning Meetings

I&T Test Summary Reports


LAT Integration Facility:

Building 33 Area Hazard Analysis (AHA)

Integration Facility Monitoring System

Cleanroom Phone Directory

Building 33 Access List

Electronic Logs


IFCT Assembly Instruction Data Sheets (AIDS):

IFCT AIDS Log

IFCT AIDS Folder


Grid Configuration Log – Working Version:

Grid Configuration Log


Selected Documents:

This is a selected list of IFCT department documents with links to LATDocs.

Document Number

Document Title

LAT-MD-01386

LAT Facilities Plan

LAT-MD-01533

EGSE  Plan

LAT-PS-03027

Calorimeter Integration Procedures

LAT-PS-03058

Tracker Integration Procedures 

LAT-PS-03060

Room 104, Ingress and Egress of Large Equipment Procedure

LAT-PS-03062

Tem/TemPS Shimming  Procedure 

LAT-PS-03259

Shear Plate Shim Procedure

LAT-PS-03263

Fastener Installation and Torquing Procedure 

LAT-PS-03276

Two Tower  Test Procedure

LAT-PS-03281

LAT Test Floor Configuration Procedure 

LAT-PS-03287

Cal Module Test Procedure 

LAT-PS-03290

Tracker Module Test  Procedure 

LAT-PS-03291

Flight Hardware Bag and Purge Procedure 

LAT-PS-03481

GLAST LAT Integration Facility Emergency Plan

LAT-TD-03875

TEM EICIT Procedure

LAT-TD-04097

TEM SVT Procedure

LAT-TD-04098

TPS SVT Procedure

LAT-TD-04099

TPS EICIT Procedure

LAT-PS-04244

Load Mass simulators into GRID MGSE 

LAT-TD-04260

GASU EICIT Procedure

LAT-TD-04325

Acceptance Test Procedure, Break out Boxes and Cables 

LAT-TD-04332

PDU EICIT Procedure

LAT-TD-04382

Flight GASU SVT Procedure

LAT-TD-04384

Flight PDU SVT Procedure

LAT-PS-04436

AeroGo Air Bearing Reference Guide

LAT-PS-04459

Connector Mate and Demate

LAT-PS-04511

Data Collection Procedure

LAT-PS-04512

Single Tower Test Procedure 

LAT-PS-04727

Tie Mount Bonding Procedure

LAT-PS-05487

Mobile Hydraulic Unit (MHU) Operations Procedure

LAT-PS-05504

Computing Infrastructure

LAT-PS-05527

I&T Test Stand Setup Procedure

LAT-PS-05736

LATTE and Components Installation

Listing of all Integration and Test documents - the complete list of all Integration and Test documents is available on the main I&T webpage

LATDocs - link to the project document repository searchable list of all documents

Redlined Procedure Drafts - Redlined drafts of documents


I&T EGSE:

Inventory

Tower-Test Diagram 3/22/05


IFCT Team:

Larry Wai - IFCT Manager

Tom Borden - IFCT Engineer

Hiro Tajima - Tracker Integration Physicist

Eliazar Ortiz – Mechanical Integration Engineer

Mark Molini – Lead Mechanical Technician

Leo Manger – Lead Mechanical Technician

Reggie Rogers – Mechanical Technician

Tom Nieland - Mechanical Technician

Dave Kiehl– Mechanical Technician

John Canfield - Lead Electrical Technician

Toan Le - Electrical Technician

Phuc Hoang - Electrical Technician