Online telecon notes for September
11, 2002
Attending:
- Connie Houchens (GSFC/ACD)
- Sharon Orsborne (GSFC/ACD)
- Jim La (GSFC/ACD)
- Glen Unger (GSFC/ACD-ELX)
- Byron Leas (NRL/CAL)
- Johann Cohen-Tanugi (Pisa/TKR)
- Dave Nelson (SLAC/TKR, ELX)
- Mike Huffer (SLAC/ELX)
- Eduardo do Couto e Silva
(SLAC/I&T-SVAC)
- Dave Lung (SLAC/IOC)
- Alicia Kavelaars
(SLAC/I&T-Online)
- Selim Tuvi
(SLAC/I&T-Online), minutes author
- Ric Claus
(SLAC/I&T-Online)
Topics:
- TKR (Johann)
- Suggested we look at Ruby and FOX as scripting and GUI tools
- ACD (Connie, Sharon, Jim)
- Comments on trade study white paper: Goddard comments have been
incorporated into the document.
- Changes to the engineering unit. Tutorial on Python and Qt
- Sharon is working on getting up to date
- Received from Glen the preliminary test program.
- Glen: Dave Shepherd detailed test plan for GARC testing first
version of GARC and the second version of GAFE.
- Tests will be merged and given to Connie and Sharon.
- Won't happen for another month.
- Tests consist of LabVIEW and C code, register and bit toggle
tests.
- Pieces of the test procedure given to Connie.
- Dave S. is measuring voltages, pulse widths ( no need to give
those tests to Connie)
- Books
- Python Essential Reference, Second Edition, Updated to Python
2.1, David M. Beazley, New Riders
- Essential XML Quick Reference, Aaron Skonnard and Martin Gudgin,
Addison Wesley
- New python interface will be used by CAL & TKR and then ACD.
- CAL (Byron)
- New regression test,
Byron will start testing the new python interface.
- Mike: GCRC register #
changes (Jim Ampe)
- Will not be ready before next week
- ELX (Mike)
- AEM nothing to report
- TEM: Most effort is on Curt & Leonid, working on cables and
connectors.
- New fully populated front-end board with standard cabling is
being worked on
- Dave Nelson: Y board layout needs to be redone due to thermal
reasons.
- Byron: had problem reading some of the FEs. Using old board with
new chips.
- New board signal conditioning problem.
- PSA still in layout.
- Enclosure is wrapping up.
- Transition board came out of layout and going to fab.
- LCB: New engineer showed up
- TKR (Dave Nelson)
- Tracker progress, SCL
& Python is still being used. Qt for GUI.
- 1500 channel threshold scan, taking 20min.
- With the new python interface estimate of speed improvement 2
orders of magnitude.
- gnuPlot is being tested.
- QWT another object oriented plotting tool.
- Calibration scripts:
- No date has been agreed
upon.
- Scripts needed for engineering model for mini tower test,
scheduled for April '03.
- Eduardo's list
- Byron: Neil Johnson doesn't feel the need to deliver the scripts
until the hardware is ready.
- Dave: TKR is currently not putting any effort into these scripts. Not high enough on the priority list.
- Eduardo: I&T needs calibration scripts at least one month
before hardware delivery
- Byron: Need Software test procedure document