Online telecon notes for January 15,
2003
Attending:
- Connie Houchens (GSFC/ACD)
- Sharon Orsborne (GSFC/ACD)
- Byron Leas (NRL/CAL)
- Luca Latronico (INFN
Pisa/TKR)
- Luca Baldini (INFN Pisa/TKR)
- Johann Cohen-Tenugi (INFN
Pisa/TKR)
- Dave Nelson (SLAC/TKR)
- Mike Huffer (SLAC/ELX)
- Selim Tuvi
(SLAC/I&T-Online), minutes author
- Ric Claus (SLAC/I&T-Online)
Topics:
- Core (Ric, Selim)
- Online version P00-11-00
released – Uses Qt 3.1.1 and PyQt 3.5
- Caution in updating Qt release
- Need to compile Qt for installation, therefore the need for a
C++ compiler.
- Online will look into distributing the C++ compiler.
- PyQt and Qt form a pair: versions must match
- Byron: Event data synchronization issue resolved
- TKR
- The hardware arrived in Pisa.
Got it running after solving networking issues
- Started training people. Initial run of script and tests were
successful.
- No 220V switch on the 28V power supply (they are currently using
a transformer)
- MCMs will be transported from Santa Cruz for arrival in Pisa Jan
20
- They will be sent to the company to bond them with ladders.
- Trays to arrive in Pisa Feb 10
- Will ship to SLAC around Feb 24
- Johann due at SLAC on Jan 23rd
- Two interface boards to be kept in Pisa until Feb 10th then send
them to SLAC
- Dave: lack of transition boards leaves him without a running
system. Misunderstanding between Luca and Dave
- ACD
- Connie got RunControl working
- CAL (Byron)
- File search GUI.
- RunControl does not automatically go to the stop state after the
requested number of triggers are collected.
- Ric: This is normal behaviour since RunControl isn’t in charge
of triggering the system
- Message logging GUI
- Wants to have multiple configurations per schema
- Configuration verification tool needed - medium priority
- Configuration saving tool needed (to restore it later)
- Ability to apply unattached configurations.
- Request 2nd test stand for arrival within the next 2
weeks
- Also need a VME crate for it
- ELX (Mike)
- Test jigs finished
- Mounting parts for AFEE boards won't be supplied
- ACD primer document updated (in anticipation for v2 of ACD)
- Memo out to ACD people by end of the week.
- Infrastructure for v2 in progress
- Sharon: Need for a second teststand.
- Money issue: will need to get cleared with Gunther