Online telecon notes for January 22,
2003
Attending:
- Connie Houchens (GSFC/ACD)
- Sharon Orsborne (GSFC/ACD)
- Byron Leas (NRL/CAL)
- Luca Baldini (INFN Pisa/TKR)
- Mike Huffer (SLAC/ELX)
- Larry Wai (SLAC/I&T-IFCT)
- Selim Tuvi
(SLAC/I&T-Online), minutes author
- Ric Claus (SLAC/I&T-Online)
Topics:
- Core (Ric, Selim)
- Working on housekeeping/monitoring GUI and event parsing
- Alicia: Back to working full-time on the configuration GUI after
RunControl and Message Logger GUIs
- Post meeting note: Will be distributing VS.NET to the remote test
stands by CD
- ACD (Connie)
- Working with engineers on external trigger, pulse generation
- VS.Net runtime DLL missing.
- Selim: Should be copied to the system once Hippodraw is
installed.
- Sharon's legal concern with switching from non-commercial Qt to
commercial Qt.
- Qt apps can be developed under Linux or Windows.
- CAL (Byron)
- Haven’t upgraded to P00-11-00 or the new Qt/PyQt yet – No time
- In runControl, while
event data collection is going on, he cannot open any windows. Could be a
yield problem or a Windows scheduler quirk
- Draft of software requirements document
- TKR (Luca B.)
- Have a fully working system
- An MCM arrived in Pisa.
Expect 6-7 more in ~2 weeks
- Installed the new release
- Working with HippoDraw
- Johann left this morning and expected at SLAC tomorrow.
- Larry: When will the mini-tower arrive at SLAC?
- I&T/IFCT (Larry)
- Asked Navneet (newish grad student) to use/exercise RunControl
- Want to add TEM power off/on GUI button
- Really means Front End Electronics power, not TEM
- Charge injection scans
- Test report generation
- ELX (Mike)
- Shipping 2nd test stand to CAL in the next couple of
days – will send e-mail when it leaves SLAC
- Shipping two test jigs to Byron.
- VME crate & additional cables NRL's responsibility on
Gunther's request.
- OK with Mike if CAL wants to extend GASU cable by splicing
provided cable
- ACD memo sent to Dave Thompson – Up to him how to disseminate it,
but ACD I&T folk should probably get a hold of the “ACD Test-Stand Architecture”
document
- Middle of February for ACD v2 release
- 4 blank GARC/GAFE tester boards arrived at SLAC. In the process of getting them loaded.