General - Eduardo

SVAC Plan- Will be signed off this Friday so that documentation and implementation can proceed. We are behind in some documents for EM activities. Nevertheless work is continuing.

Monte Carlo Simulation - Xin 

BT parameter space - Xin set up software infrastructure and produced MC runs from 20 MeV to 40 GeV. Started discussion with S. Ritz about cuts to be used for analysis of beam test parameter space. Expect plots for next 2 weeks. 

Geometry - Xin produced one tower with new GLEAM and first pass on information needed from subsystems for update of EM geometry. Eduardo is assembling it to proceed with documentation. We will meet TKR this Friday and has already initiated discussions with Eric (I&T MGSE) for preparation of drawings.

Alignment - Hiro 

Alignment - Progress with alignment code (ladders), Hiro is writing an alignment Plan due in July

Database - Ashmi, Eduardo

Concept - Fruitful discussions with Eric (CAL), Alex (ACD) during Face to Face. Will have a draft released next week after approval of SVAC Plan. Summer student being hired to implement EM database (replacement for Ashmi)