Action list after Meeting of May
25, 2001
To be revisited
on May 31, 2001
- Hartmut
- Check energy dependence and include azimuth angle and check (Field of
View)
- Eduardo-
Find out about hardener systematic effects in coherent beam and put
together a working draft of the calibration plan. Discuss with M. Nordby
scheduling and mechanical fixtures. Include alignment in the plan (there is
already a note from Steve)
- Benoit- Come up with a plan for calorimeter measurements at low
energy beam (test matrix).
- Steve –
Provide guidelines for the background study with the hadron beam
- Gary –
Follow the Van der Graaf availability.