Action list after Meeting of March 29, 2001

To be revisited on April 12, 2001

 

  1. Bob - Talk to Alex Moiseev to understand ACD needs for a 300 GeV test beam and if possible give us an idea of how much have they accomplished in MC validation.
  2. Eduardo - Split requirements table, include more parameters (related to Energy) and focus on getting number of photons, triggers and beam time needed. 
  3. Eduardo and Hartmut - Evaluate how much information we can get from the PSF95/PSF68 ratio without slowing down the calibration plan.
  4. Bernard - Come up with a plan for calorimeter measurements at 300 GeV and see how does our discussion fits in the Bordeaux plans. 
  5. Gary - follow up operational Plans for SLAC 2003/2004
  6. Gary & Hartmut - understand tagging for the Van der Graaf
  7. Hartmut - figure out where to put Silicon trays for EM in case we go for a high energy beam run at CERN. 
  8. Eduardo & Tune - Understand tagger for coherent photon beam and get spectra from Peter Bosted.
  9. Hartmut and Steve – Study an alternative configuration other than 1 x4 or 2 x 2 ? 
  10. Everybody- Send  thoughts to Steve for hadron beam and background rejection.

  To do list from previous meetings

  1. Eduardo and Tune (consult with Bob and D. Thompson) – Investigate impact point, energy and angle bins for tests.

  2. Eduardo, Tune and Gary - Study feasibility of  backscattered beam.