Action list after Meeting of March
29, 2001
To be revisited
on April 12, 2001
- Bob
- Talk to Alex Moiseev to understand ACD needs for a 300 GeV test
beam and if possible give us an idea of how much have they accomplished in
MC validation.
- Eduardo
- Split requirements table, include more parameters (related to Energy) and
focus on getting number of photons, triggers and beam time needed.
- Eduardo
and Hartmut - Evaluate how much information we can get from the
PSF95/PSF68 ratio without slowing down the calibration plan.
- Bernard
- Come up with a plan for calorimeter measurements at 300 GeV and see how
does our discussion fits in the Bordeaux plans.
- Gary
- follow up operational Plans for SLAC 2003/2004
- Gary
& Hartmut - understand tagging for the Van der Graaf
- Hartmut
- figure out where to put Silicon trays for EM in case we go for a
high energy beam run at CERN.
- Eduardo
& Tune - Understand tagger for coherent photon beam and get
spectra from Peter Bosted.
- Hartmut
and Steve – Study an alternative configuration other than 1 x4 or 2
x 2 ?
- Everybody-
Send thoughts to Steve for hadron beam and background rejection.
To do list from previous meetings
-
Eduardo
and Tune (consult with Bob and D. Thompson) – Investigate impact point,
energy and angle bins for tests.
-
Eduardo,
Tune and Gary - Study feasibility of backscattered beam.