Last Revision February 04, 2003

New plan

Suggestions for functionality tests

I&T Calibration Committee MAIN Web Site 

                                             SUMMARY TALKS

Presentations to the main calibration group
Martin May 22, 2001 (Vibration, Verification Outline)
Eduardo - April 16, 2001   Martin - April 16, 2001
March 30, 2001

                                           MEETINGS AND TALKS

Agenda and Talks Minutes Action Lists
June 8,2001    
May 31,2001 May 31, 2001 May 31,2001
  May 25, 2001 May 25,2001 May 25,2001
May 17,2001 May 18 2001 May 18,2001
April 12, 2001 April 12 2001 April 12, 2001
March,28 2001  March 28,2001 March 28, 2001

 March 23, 2001

 

March 23, 2001

                                                   WORKING NOTES

Photon Beam Coherent Beam at SLAC (Peter Bosted)

Notes from a meeting at SLAC with Peter Bosted (Eduardo)

Notes on the Van der Graaf (Gary)

Test Matrix for the Photon Beam  (Eduardo, Tune)

Free Electron laser beam  (Bob) 

Test Matrix Note  (Bob)

Hadron Beam
Positron Beam Test Matrix (Benoit)
Tower Configuration Quick look at simulation (Steve)

A possible configuration  (Hartmut)

Requirements Verification Tests for LAT PS Science Requirements (Steve)

Requirements Table  (Steve, Eduardo, Bob)

Notes on Science Requirements  (Bob)

Notes on the Point Spread Function  (Eduardo)

Energy/angle bins Test Matrix for the Photon Beam  (Eduardo, Tune)

Matrix for Field of View (Hartmut)

EGRET Ground Calibration paper (EGRET team)
Engineering Model Working notes  (Eduardo)

EM ACD configuration  (Bob)

EM_Tracker_configuration (Hartmut)

General Comments (Bob)

LAT in a beam  (Tony Waite)

Test Matrices - overview (Eduardo)

Cosmic Rays Alignment with muons (Steve)

Motivation for cosmics (Hartmut)

cosmic_ray_telescope  (Hartmut)