2007-07-08 Velcro Failure and RTV to Temp Sensor Wires

2007-07-16 +Y Radiator Particles

2007-07-16 Post EMI Inspection

2007-05-01 Moving The 1 x 4 Into The Cleanroom

2007-04-30 Receiving The 1 x 4 From Italy

2007-04-19 Post Results Of Acrylic Thermal Test

2007-04-18 Acrylic Thermal Test Photos

2007-03-13 Cleanroom Crane Proof Load

2007-03-07 Proof Load Radiator Lift Fixture

2007-01-29 Accelerometer Calibration Photos

2006-07-28 TVAC Closing Door

2006-07-25 Move to TVAC

2006-07-14 Move to Trolley

2006-07-14 LAT Photos

2006-07-13 LAT Photos

2006-07-12 Turn Over

2006-07-11 Turning Bars

2006-06-29 Blankets and Move to Acoustic

2006-06-28 EMI

2006-06-22 EMI

2006-06-16 EMI Move and Op

2006-06-14 Radiator Installation

2006-06-13 LAT Pictures

2006-06-08 Fit Checking The Radiator Panel

2006-06-07 Moving the LAT From The Vibe Test Area Photos

2006-06-06 Radiator Panel Inspection Photos

2006-06-02 Shipping Radiator Panels Photos

2006-06-02 N.R.L. Y Axis Vibe Inspection Photos

2006-06-01 Static Load Test Continuation Photos

2006-06-01 N.R.L. Set-Up For Y Axis Vibe Test Photos

2006-05-31 Radiator Panel Rework Photos

2006-05-30 Radiator Static Load Test Photos

2006-05-25 Moving The L.A.T. To The Vibe Table

2006-05-14 Recieving The L.A.T. At N.R.L

2006-05-11 Prepared The L.A.T. For Shipping

2006-05-10 Staging Equipment To Ship To N.R.L

2006-05-10 Preparing The L.A.T. For Shipping

2006-05-09 Proof Load Test For 4X4 Lift Fixture, G.P.R. And Rotation Stand

2006-05-08 Preparing The Lifting Brackets On The Proof Weight Set

2006-05-08 A Leak In Room 103

2006-05-05 Repairing Radiator Panel

2006-05-05 Continue Testing The L.A.T

2006-05-04 Installing The L.A.T. Onto The Shipping Container Base

2006-05-03 Radiator Panel Repair

2006-05-02 Removing P.A.P.' s From Rotation Stand And Bagging The L.A.T

2006-05-02 Radiator Panel Repair

2006-05-01 Radiator Panel Repair

2006-04-30 Installing The T.I.P. Plate

2006-04-28 Preparing Shipping Container

2006-04-28 +Y Radiator Panel Inspection

2006-04-27 Weighed The T.I.P. & Measured shipping Container

2006-04-26 Heat Pipe Support Tool

2006-04-26 +Y & -Y Panels

2006-04-25 Install Heat Pipe Shims on +Y Side

2006-04-24 Installing Heat Pipe Shims on -Y Side

2006-04-23 Installing The X-LAT Plate

2006-04-22 X-LAT Plate Final Close out

2006-04-21 Moving The -Y Radiator Panel To The Clean Tent

2006-04-19 +Y Radiator Panel Isolation testing

2006-04-18 Inspect +Y Radiator Panel and Install Strain Gauges

2006-04-13 General Harness

2006-04-13 Checking Flatness Across The LAT

2006-04-11 Adjusting And Securing Cables

2006-04-09 LAT Survey

2006-04-07 Van Der Graff

2006-04-07 Fully Populated GRID

2006-04-06 GRID 2 Post Stress Analysis

2006-04-06 Accelerometer Locations

2006-04-05 GRID 2 Post Stress Analysis

2006-03-30 Proposed Flex Line Routing

2006-03-30 Harness

2006-03-24 N.R.L. Pathfinder 2 Day 4

2006-03-23 N.R.L. Pathfinder 2 Day 3

2006-03-22 N.R.L. Pathfinder 2 Day 2

2006-03-21 N.R.L. Pathfinder 2 Day 1

2006-03-16 Heater Control Box Flatness Check

2006-03-14 Fab And Fit Check Of Flexures for the TIP

2006-03-09 Preliminary M.L.I. Fit Check

2006-03-08 Reworked Harness Configuration

2006-03-03 Securing Harness With RTV

2006-03-02 Radiator Panel Lift Fixture Proof Load Test

2006-02-28 M.L.I. Support Bracket Mis-matched Radius

2006-02-24 Preparing Radiator Pane Lift Fixturel For A Proof load test

2006-02-24 Tour Of Bldg. 33

2006-02-23 Accelerometer

2006-02-22 Harness

2006-02-17 N.R.L

2006-02-16 N.R.L

2006-02-15 N.R.L

2006-02-14 N.R.L

2006-02-06 Fabricated Antenna Fixture

2006-02-03 Preparing Fixture For Radiator Testing

2006-01-31 Radiator Panel Fixture Proof Test

2006-01-30 Thermistor Harness Shield Terminations

2006-01-24 Proof Load 15 Ton Crane

2006-01-20 Installed Two S.I.U.'s

2006-01-17 I & T Crane Scale

2006-01-13 LAT Test MGSE Test Stand

2006-01-09 X-LAT Plate Chiller Plumbing And Routing

2005-12-29 Bonding Thermistors And Accel'S To The X-LAT Plate

2005-12-20 Chiller Assembly

2005-12-19 X-LAT Plate Shim Bonding Samples

2005-12-07 Installing A Calorimeter With The G.L.A.S.T. Italian Team

2005-12-06 Tracker Installation Exercise With G.L.A.S.T. Italian Team Members

2005-12-05 Fixture To Support Heatpipes During Epoxy Removal

2005-12-05 GASU Installation & Initial Cables Mated

2005-11-23 I Guess We Were A Little Late

2005-11-23 Installing The ACD Onto The GRID

2005-11-22 Finalizing Thermistor, Heater, And Thermocouple, Harness Routing And Accelerometer Locations

2005-11-21 Moving The ACD Into Room 104

2005-11-17 Tracker Thermocouples Completed

2005-11-16 Tracker Thermocouple Installation

2005-11-15 Bonding Down Spout Heat Pipes

2005-11-14 Down Spout Heat Pipe Alignment Fixture

2005-11-11 Group Photos

2005-11-11 Fit Check The X-LAT Plate

2005-11-10 Down Spout Heat Pipes

2005-11-09 X-LAT Plate

2005-11-09 Photo Day

2005-11-04 Thermostat And Heater Harness

2005-11-04 LAT Cable Routings

2005-11-03 Thermostat And Heater Harness

2005-11-02 Accelerometer Testing

2005-10-31 Accelerometer Installation

2005-10-28 Bonding Ty-mounts

2005-10-27 Accelerometer Testing

2005-10-26 Harness Routing

2005-10-25 ACD Interface

2005-10-24 Thermistor Installation

2005-10-24 Crimp Pull Test

2005-10-21 Harness Routing

2005-10-20 EMI Shield Installation

2005-10-19 Sixteen Towers

2005-10-19 Initial Cable Routings

2005-10-18 Installing Tracker 15 Into Bay 3

2005-10-18 CAL-TEM-TPS Installed Into Bay 3

2005-10-17 Tracker Cable Repairs

2005-10-14 Receiving Tracker SN 15 From SFO

2005-10-14 Receiving Test Setup For Tracker SN 15

2005-10-14 Ice Cream Social

2005-10-14 Installing Calorimeter 117 Into Bay2

2005-10-12 Receiving Test For Tracker FM8

2005-10-12 Installing Tracker FM 14 Into Bay 2

2005-10-11 Installing Cable Trays

2005-10-10 Receiving Inspection For Tracker FM12

2005-10-10 Installing Calorimeters Into Bay's 6 & 7

2005-10-07 Installing Tracker Into Bay 7

2005-10-07 Installing Tracker Into Bay 6

2005-10-07 Preparing Tracker For Receiving Test

2005-10-05 Preparing GRID II For Shipping

2005-10-03 Installing Tracker SN 0011 Into The GRID

2005-10-03 Installing Calorimeter 114 Into Bay 15

2005-09-30 Grid Purge Flow Test

2005-09-30 Delivery From Lockheed

2005-09-29 Installing Tracker Into Bay 14

2005-09-29 Installing Calorimeter Into Bay 14

2005-09-28 CAL-TEM-TPS Assembly For Bay 6

2005-09-26 Receiving Trackers At SFO

2005-09-23 The LAT Bagged

2005-09-22 Installing CAL-TEM-TPS Into Bay 11

2005-09-21 Installing Tracker Into Bay 11

2005-09-21 Tracker SN 0010 Completed Receiving Test, Ready To Install Into Bay 14

2005-09-20 Bonding Heaters

2005-09-20 Installing A Tracker Into Bay 10

2005-09-16 Bonding Heaters On The Grid

2005-09-15 Weight Of Calorimeter Lift Fixture Components

2005-09-14 Receiving Inspection On Tracker No. 9

2005-09-14 Proof Load A.C.D. Lift Fixture

2005-09-14 Heater Bonding Samples

2005-09-13 Removing Cal-Tem-Tps sn 0011 From Metrology Bay Then Shimming Cal. 114

2005-09-13 Receiving Inspection On Tracker No. 7

2005-09-13 Proof Loading 15 Ton Crane

2005-09-13 Gasu - ACD Interface

2005-09-12 Installing TPS-TEM-Thermistor Harness On To Calorimeter SN 113

2005-09-09 Installing Calorimeter 113 Into Metrology Bay

2005-09-08 Final Prep For Moving The ACD Mock-up Into Rm. 104

2005-09-07 Building The A.C.D. Proof Weight Fixture

2005-09-06 Thermal Bond Testing

2005-09-05 Installing Calorimeter SN 112 Into The Metrology Bay and Thermistor Installation

2005-09-02 Cable Tray Installation

2005-09-01 Menning Plate Installation

2005-08-31 Crane upgrades

2005-08-30 Installing Thermistor Harness Into Bay's 0 & 4

2005-08-29 Replacing T.P.S. On Bay's 0 & 4

2005-08-26 ACD Mockup For Lift Fixture Exercises

2005-08-24 Building The ACD Mock-up

2005-08-13 Delivery Of The A.C.D

2005-08-11 Receiving Calorimeter from NRL

2005-08-11 Harness Cable Routings

2005-08-10 Kids Day At S.L.A.C

2005-08-05 Component Ground Test

2005-08-04 Install Tracker 6 Into Bay 12

2005-08-03 Install Calorimeter Into Bay 13

2005-08-02 Install Tracker 4 Into Bay 13

2005-08-01 Receiving Cross LAT Plate

2005-08-01 EMI Taping Tracker No 6

2005-07-29 EMI Fit Check 2

2005-07-29 Shear Plate Installation

2005-07-26 Thermistor Harness Installation

2005-07-26 Nut Splitting

2005-07-25 Receiving Inspection Tracker 6

2005-07-25 Height Gage

2005-07-23 Picking Up Tracker From SFO

2005-07-21 EMI Shield Kit

2005-07-20 EMI Skirt Fit Check

2005-07-20 Delivery From Lockheed Martin

2005-07-19 Receiving GRID 2

2005-07-11 ESD Bleed

2005-07-10 Thermo-Vac Test on Triple Joint Bond Test

2005-07-08 The Grid Purge Tube Routings and Flow Meter

2005-07-08 Shipping Calorimeter to NRL

2005-07-05 Thermal Test Samples

2005-07-05 TEM-TPS-CAL Ready For Bay 13

2005-07-05 E.G.S.E. G.A.S.U

2005-06-30 Installing Calorimeter 108 Into The Metrology Bay

2005-06-28 Taping EMI Shield On Tracker 4

2005-06-23 Thermal Testing

2005-06-23 Picking Up The Last Four Calorimeters From

2005-06-15 TPS Screw Holes

2005-06-15 Installing Shear Plates

2005-06-14 Post Grid Survey

2005-06-14 Correct Connector Hardware Reference

2005-06-14 Calorimeter Receiving Inspections

2005-06-13 Escorting Calorimeter Shipment From SFO To SLAC

2005-06-10 Installing CAL-TEM-TPS Into Bay 8

2005-06-10 2-56 ScrewTracker Cable Connectorss On

2005-06-09 Thermistor Harness For CAL-TEM-TPS 2559 SN 006

2005-06-09 Installing Calorimeter 107 Into Metrology Bay

2005-06-09 LAT Cooling

2005-06-08 Installing Tracker SN 5 Into Bay 8

2005-06-07 Receiving Inspection of Calorimeters

2005-06-07 Install Calorimeter SN 106 Into Bay 9

2005-06-07 Bonding Tracker Cables

2005-06-06 Picking Up Calorimeters At SFO

2005-06-06 Installing Tracker SN 3 Into Bay 9

2005-06-05 Shimming And Thermistor Bonding Cal 106

2005-06-03 Installing Calorimeter sn 106 Into Metrology Bay

2005-06-03 Electrical hazard

2005-06-02 Receiving Trackers from Delta @ SFO

2005-06-02 Bonding Copper Tubing For Axiliary Cooling System

2005-06-01 Auxiliary Cooling System Copper Tubing

2005-05-31 Cleaning Shear Plates

2005-05-31 Grid Bay Locations Reference Under The Rotation Stand

2005-05-26 Mating Bay 4 & 5 TEM-TPS Flight Cables

2005-05-26 Cold Check Of Flight Cables

2005-05-26 Bay 4 & 5 Flight Cables Mated

2005-05-25 Tracker 0, 1, 4, & 5 In The Grid

2005-05-25 Mating & Torque All Tracker Cables For First Four Bays

2005-05-25 Shimming & Installing Calorimeter 103 Into Bay 1

2005-05-24 Calorimeter 103 Thermistor Bonding - TEM-TPS Shimming

2005-05-20 Calorimeter 102 Thermistor Harness Bonding

2005-05-20 Metalic Particulate On Calorimeter 102 Harness

2005-05-20 Shimming Calorimeter 102-TEM-TPS

2005-05-20 Install Calorimeter 102 Into Metrology Bay

2005-05-19 Installing Tracker SN2 Into Bay 1

2005-05-19 Using PAP To Remove EM TEM-TPS

2005-05-19 First Four Trackers Installed

2005-05-19 Thermal Strap Doublers Warped

2005-05-18 Installing Thermal Strap Hardware

2005-05-18 Cable Clearance

2005-05-18 Bagging The Grid

2005-05-17 Installing Tracker 01 Into Bay 5

2005-05-16 Compare Flight Cables To EGSE Cables

2005-05-16 Prep Grid To Install Bays 1 & 5

2005-05-16 EM GASU-PDU-EGSE Cables On The Grid

2005-05-13 Completing Grid Thermistor Harness & Purge Channel Covers

2005-05-12 Modifying TEM-TPS Height On Blue Test Cart

2005-05-12 Crimping The Thermal Instrumentation On The Grid

2005-05-11 Freight Damage

2005-05-11 Connector Pin & Socket Damage

2005-05-10 Crimp

2005-05-09 Pull Testor and Crimping Tool

2005-05-09 Thermal Bonding

2005-05-06 Harness Routings

2005-05-03 Thermistor Harness Fit Check

2005-05-03 ROUTED TEST CABLES TO THE LAT

2005-05-02 Tracker SN 3 EMI Taping

2005-04-29 Data Taking With Muon Telescope

2005-04-28 Tracker Lift Fixture Proof Load

2005-04-26 G-Force Test With Data Logger

2005-04-25 Single Bay Plate Alignment Rod Interference

2005-04-23 Receiving Tracker SN 01 & 02

2005-04-22 Recieving Tracker Sn 01 @ SFO

2005-04-21 Installing Adapter Chrome Handle On Cart 3

2005-04-18 Routing and Installing E.G.S.E Cables

2005-04-18 Remove and Replace Tem Power Supply Simulation

2005-04-15 Bonding Coupon Results

2005-04-15 Kapton Taping Tracker B Flex Cables

2005-04-15 E.G.S.E. Installation

2005-04-14 Tower A E.M.I. Tape Repair

2005-04-14 Bonding Test Coupon CV2946

2005-04-13 Mass Simulator On To The Grid Complete

2005-04-12 Install Mass Simulators To The Grid

2005-04-11 Group Photo's

2005-04-08 Install Calorimeter 105 Into Bay 4

2005-04-08 Bonding Tracker B Flex cables

2005-04-08 Removal Of Calorimeter 105 From Single Bay Test Stand

2005-04-08 Pre-Removal Of Tracker B From Single Bay Test Stand

2005-04-08 Installation Of Tracker B Into The Grid

2005-04-08 I & T Tool Box Inventory

2005-04-07 Preparing Tracker For E.M.I. Testing

2005-04-07 Tracker Flex Cable Length NCR

2005-04-06 Tracker Shipping Prep. For E.M.I. Testing

2005-04-06 Tracker Cable Interference

2005-04-05 T.E.M. Electrical Testing

2005-04-05 Calorimeter Installation In to Bay Zero

2005-04-05 Continue Tracker A Cone Installation

2005-04-04 Preparation And Installation of Tracker A To Bay Zero

2005-04-02 Receiving Tracker sn 2

2005-04-01 Single Bay Fixture Proof Load

2005-03-31 Tooling Ball Nest Hole Damage

2005-03-31 GPR Corner Brackets After Modifications

2005-03-31 Data Taking With Am241

2005-03-30 Shims On Tracker B

2005-03-30 Install And Mate Calorimeter 105 To Tracker B

2005-03-29 Install Tracker B Into Single Bay Rotation Stand

2005-03-28 Remove G.P.R. From The Grid And Reinstall

2005-03-28 Moving The Grid And Rotation Stand Into Room 104

2005-03-28 Install G.P.R. And Grid Into Rotation Stand

2005-03-25 G.P.R. Removal And Replace Onto The Grid With ACD Interference Simulation

2005-03-24 Removing G.P.R. And Grid From The Rotation Stand

2005-03-23 Integrating the G.P.R. Into The Rotation Stand

2005-03-22 The Grid Final Inspection @ Bldg. 25

2005-03-21 G.P.R. Features @ Bldg. 25

2005-03-18 G.P.R. Rotation Stand Build-up

2005-03-17 Single Bay Rotation Stand Proof Load Test

2005-03-16 Moving The Rotation Stand From Bldg. 750 to Bldg. 33

2005-03-12 Machine Work On Single Bay Transition Flange

2005-03-11 Prepare Grid For Bldg. 25

2005-03-11 Proof Load G.P.R. and Move To Bldg. 25

2005-03-10 G.P.R. Assembly Prep

2005-03-10 EMI Qual Test Dummy Cal Gasket

2005-03-10 C.G. Of The Grid Calculation

2005-03-08 TEM PSU shimmed to Calorimeter 105

2005-03-07 Calorimeter 105 Into Metrology Bay

2005-03-04 Single Bay Lift Fixture Leveling Exercise

2005-03-03 Single Bay Rotation Stand Proof

2005-03-03 Grid Adapter Fit Check

2005-03-02 Prepare The Grid To Install Corner Brackets

2005-03-02 NCR 264 Repair And Radiator Corner Bracket Installation

2005-03-01 Build-up of 2nd Single Bay Rotation Stand

2005-02-28 Remove TEM-TPS From Calorimeter 107

2005-02-28 Remove TEM-TPS From Calorimeter 106

2005-02-25 Single Bay Lift Fixture Fit Check

2005-02-25 Calorimeter 105 TEM TPS Removal

2005-02-24 Single Bay Measurements

2005-02-24 Proof Load Weights

2005-02-24 Grid Thermistor and Purge Tube Bonding

2005-02-23 Receiving Calorimeter 6 & 7

2005-02-23 Fit New Check Single Bay

2005-02-23 ESD Ground On Blue Cart 2

2005-02-23 104 Crane Load Cell

2005-02-18 EMI Taping on Tracker B

2005-02-17 Removing Connector Savers from GLAT 1752

2005-02-17 Install Calorimeter into 1 x with tracker A

2005-02-16 The Grid

2005-02-15 The Grid Post Bake Out

2005-02-14 Prep for The Grid Bake Out

2005-02-14 Receiving Tracker B

2005-02-13 Transporting Tracker B from SFO to Stanford

2005-02-11 Install Tracker A into Single Bay

2005-02-10 Tracker Installation Readiness Review

2005 02-10 Tracker Lift Fixture Proof Test

2005-02-07 Transfer Single Bay To The Transportation Cart

2005-02-05 Tracker Lift Fixture Modification

2005-01-31 Forklift Proof Load

2005-01-31 Tracker Lift Fixture Comparison

2005-01-28 Oven Setup

2005-01-28 EMI Shield Tracker A

2005-01-27 EMI Shield Tracker A

2005-01-26 EMI Shield Practice

2005-01-25 EMI Shield Practice

2005-01-24 Practice EMI Taping

2005-01-24 Forklift

2005-01-23 Tracker EMI Shield Test

2005-01-21 Tracker EMI Shield Prep For Paint

2005-01-20 Forklift-Vac. Chamber

2005-01-19 Heatpipe Bonding

2005-01-18 Grid Rework

2005-01-15 Tracker Receiving

2005-01-11 4X4 Z Axis Horizontal Lift fixture

2005-01-10 Tracker Cable Bond Samples

2005-01-10 Receiving Calorimeters @ SFO

2005-01-07 Trace Tracker Cables in the 1 X 1

2005-01-06 Tracker Shipping Simulation

2005-01-05 Tracker Cables to Grid Templates Fit Check

2005-01-05 GPR To BSA

2005-01-05 Tracker Cable Bond Samples

2005-01-04 Tracker Cable Fit Check

2004-12-23 Tracker

2004-12-22 Peelable Shim Delaminiation

2004-12-22 Grid Interface Fit Check

2004-12-21 EM2 Calorimeter markings

2004-12-21 Fm 101 Calorimeter

2004-12-20 Vacuum Chamber integration

2004-12-20 Scintillator Stand Modification

2004-12-20 Obstacles on shipping container roofs

2004-12-14 Calorimeter Lift Fixture Proof Load

2004-12-07 Receiving Flight Calorimeter

2004-12-06 Hydraulic Lift

2004-12-03 Vacuum Chamber

2004-12-01 Proof load Tilt Table

2004-11-30 Test Crate

2004-11-24 Nickel Plate on Grid

2004-11-19 Shipping Tracker simulator Test

2004-11-19 Moving The Grid To The Tilt Table

2004-11-18 Van de Graaff Electronics Rack

2004-11-18 Grid in the Crate

2004-11-17 Breakout boxes and cables

2004-11-17 Integration platform control system

2004-11-17 Integration Stand Control System

2004-11-17 Integration Stand in Room 104

2004-11-16 Z Axis Lift Fixture

2004-11-12 Integration Stand PAP Weldment Status

2004-11-08 GRID DELIVERY

2004-11-02 Muon Telescope & EM

2004-11-01 CAL LAT-PS-03027

2004-10-14 Surveying The Tracker Simulator

2004-10-14 Damaged Connector Hardware

2004-10-12 Lift Fixture Turnbuckles

2004-10-12 Room 104 Crane Load Cell

2004-10-08 Scintillator Stand Modification

2004-10-07 Mini-Cal Installation into Rotating 1 x 1

2004-10-01 Install NRL Mockup into 4 X 4

2004-10-01 PSU-TEM Shimming

2004-10-01 Remove NRL Mockup From Metrology Bay

2004-09-30 Tracker Tower Simulator

2004-09-30 Install NRL Calorimeter Mockup Into Metrology bay

2004-09-29 Receiving NRL Calorimeter Mockup

2004-09-29 Hole In The Floor 104 Floor

2004-09-23 Grid Perimeter Ring

2004-09-23 Scintillator Stand

2004-09-23 Room 104 Crane

2004-09-23 Hot Knife Results

2004-09-23 T-Vac Forklift

2004-09-22 T-Vac Forklift

2004-09-22 LAT Lift Fixture

2004-09-15 Adjustable Integration Platform

2004-09-15 Scintillator stand

2004-09-03 Heater Bonding

2004-08-31 Tracker Installation Training

2004-08-31 Cone Installation Training

2004-08-26 Tracker Installation Training

2004-08-24 Moving Base Structure Assembly

2004-08-23 Tracker Cone Installation Tools

2004-08-20 Tracker Cone Installation

2004-08-18 Eric's Photos

2004-08-17 EM2 Deintegration

2004-08-13 Heat Pipe Bonding

2004-08-12 Tracker Lift Fixture

2004-08-12 Cable Tray Installation Day 2

2004-08-11 Tracker Inner Container Pull Test

2004-08-11 Multiple Tracker Simulator

2004-08-10 Checking Modified Tracker Lift Fixture

2004-08-09 Installing Cable Trays On Electrical Mockup

2004-08-06 Swapping EM Calorimeters for testing

2004-08-05 Prepare for post transport testing

2004-08-04 Calorimeter Receiving

2004-08-04 Proof Test Wt. Integration Stand

2004-08-04 Tracker Lift Fixtures

2004-07-29 Trainer Rotation Stand

2004-07-22 Cable Trays

2004-07-20 Shimming

2004-07-19 Air Bearings

2004-07-15 Shimming

2004-07-14 Forklift

2004-07-09 Radiator Panel Removal

2004-07-06 Proof Load Tracker Lift Fixture

2004-07-06 Installing Notched Cable Trays

2004-07-02 Radiator Heat Pipe Installation

2004-07-02 New Forklift

2004-07-02 1 X 4

2004-07-01 Menning Plate Epoxy Samples

2004-07-01 Connector

2004-07-01 Metrology Bay Fit Check

2004-06-29 Portable Cleanroom

2004-06-29 Air Bearings

2004-06-28 Tracker Fixture Fit Check

2004-06-28 Prep Tracker Mockup For Transport

2004-06-28 Prep EM2 for Transport To Bldg. 84

2004-06-28 Cable Trays Vs. Pan Poles

2004-06-25 I & T Mockup Tracker Tower Assembly

2004-06-25 Install EM2

2004-06-24 Tracker Lift Fixture

2004-06-24 Bonding Flexures

2004-06-23 Safe To Mates EM2

2004-06-22 EM2 Lift Fixture

2004-06-22 EM 2 Cage

2004-06-22 Cleanroom Crane

2004-06-18 EM1 SETUP

2004-06-17 Calorimeter Installation

2004-06-17 Prep for Calorimeter Installation.

2004-06-17 Van de Graaff

2004-06-16 Van de Graaff

2004-06-16 Mini Tower Installation

2004-06-16 Light Tight

2004-06-15 Tracker Prep

2004-06-15 1x1 Bay

2004-06-14 Shear Plate Removal

2004-06-14 Calorimeter Removal

2004-06-07 Install Tray in Tracker

2004-06-03 Cable Trays vs. Pan Poles

2004-06-01 Cable Trays vs. Pan Poles

2004-05-24 Cable Trays vs. Pan Poles

2004-05-21 Cable Trays vs. Pan Poles

2004-05-20 Cable Tie Downs

2004-05-20 Tracker

2004-05-18 Calorimeter Install

2004-05-13 Opening Clean Room Doors

2004-05-11 The Electrical Mockup

2004-05-11 Wooden Mockup

2004-05-10 Wooden Mockup

2004-05-07 Wooden Mockup

2004-05-06 1x4

2004-05-03 Metrology Bay

2004-04-30 Metrology Bay

2004-04-28 Calorimeter Install

2004-04-22 Training Grid

2004-04-20 Training Grid

2004-04-07 TEM, SIU, Buildup

2004-03-31 Clean Room Crane

2004-03-29 Populating The Grid

2004-03-26 Rotating Dolly

2003-10-14 EM CAL de-integration

2003-10-07 Van de Graaff setup

2003-10-02 Lead bricks

2003-09-26 EM TEM modification

2003-09-19 EM CAL Integration into single bay

2003-09-03 EM Integration

2003-08-28 EM Integration MGSE

2003-08-28 EM Integration

2003-08-27 EM Integration

2003-08-24 EM Tracker Mini Tower on bench at SLAC

2003-08-12 EM Calorimeter at SLAC