2007-07-08 Velcro Failure and RTV to Temp Sensor Wires
2007-07-16 +Y Radiator Particles
2007-07-16 Post EMI Inspection
2007-05-01 Moving The 1 x 4 Into The Cleanroom
2007-04-30 Receiving The 1 x 4 From Italy
2007-04-19 Post Results Of Acrylic Thermal Test
2007-04-18 Acrylic Thermal Test Photos
2007-03-13 Cleanroom Crane Proof Load
2007-03-07 Proof Load Radiator Lift Fixture
2007-01-29 Accelerometer Calibration Photos
2006-07-28 TVAC Closing Door
2006-07-25 Move to TVAC
2006-07-14 Move to Trolley
2006-07-14 LAT Photos
2006-07-13 LAT Photos
2006-07-12 Turn Over
2006-07-11 Turning Bars
2006-06-29 Blankets and Move to Acoustic
2006-06-28 EMI
2006-06-22 EMI
2006-06-16 EMI Move and Op
2006-06-14 Radiator Installation
2006-06-13 LAT Pictures
2006-06-08 Fit Checking The Radiator Panel
2006-06-07 Moving the LAT From The Vibe Test Area Photos
2006-06-06 Radiator Panel Inspection Photos
2006-06-02 Shipping Radiator Panels Photos
2006-06-02 N.R.L. Y Axis Vibe Inspection Photos
2006-06-01 Static Load Test Continuation Photos
2006-06-01 N.R.L. Set-Up For Y Axis Vibe Test Photos
2006-05-31 Radiator Panel Rework Photos
2006-05-30 Radiator Static Load Test Photos
2006-05-25 Moving The L.A.T. To The Vibe Table
2006-05-14 Recieving The L.A.T. At N.R.L
2006-05-11 Prepared The L.A.T. For Shipping
2006-05-10 Staging Equipment To Ship To N.R.L
2006-05-10 Preparing The L.A.T. For Shipping
2006-05-09 Proof Load Test For 4X4 Lift Fixture, G.P.R. And Rotation Stand
2006-05-08 Preparing The Lifting Brackets On The Proof Weight Set
2006-05-08 A Leak In Room 103
2006-05-05 Repairing Radiator Panel
2006-05-05 Continue Testing The L.A.T
2006-05-04 Installing The L.A.T. Onto The Shipping Container Base
2006-05-03 Radiator Panel Repair
2006-05-02 Removing P.A.P.' s From Rotation Stand And Bagging The L.A.T
2006-05-02 Radiator Panel Repair
2006-05-01 Radiator Panel Repair
2006-04-30 Installing The T.I.P. Plate
2006-04-28 Preparing Shipping Container
2006-04-28 +Y Radiator Panel Inspection
2006-04-27 Weighed The T.I.P. & Measured shipping Container
2006-04-26 Heat Pipe Support Tool
2006-04-26 +Y & -Y Panels
2006-04-25 Install Heat Pipe Shims on +Y Side
2006-04-24 Installing Heat Pipe Shims on -Y Side
2006-04-23 Installing The X-LAT Plate
2006-04-22 X-LAT Plate Final Close out
2006-04-21 Moving The -Y Radiator Panel To The Clean Tent
2006-04-19 +Y Radiator Panel Isolation testing
2006-04-18 Inspect +Y Radiator Panel and Install Strain Gauges
2006-04-13 General Harness
2006-04-13 Checking Flatness Across The LAT
2006-04-11 Adjusting And Securing Cables
2006-04-09 LAT Survey
2006-04-07 Van Der Graff
2006-04-07 Fully Populated GRID
2006-04-06 GRID 2 Post Stress Analysis
2006-04-06 Accelerometer Locations
2006-04-05 GRID 2 Post Stress Analysis
2006-03-30 Proposed Flex Line Routing
2006-03-30 Harness
2006-03-24 N.R.L. Pathfinder 2 Day 4
2006-03-23 N.R.L. Pathfinder 2 Day 3
2006-03-22 N.R.L. Pathfinder 2 Day 2
2006-03-21 N.R.L. Pathfinder 2 Day 1
2006-03-16 Heater Control Box Flatness Check
2006-03-14 Fab And Fit Check Of Flexures for the TIP
2006-03-09 Preliminary M.L.I. Fit Check
2006-03-08 Reworked Harness Configuration
2006-03-03 Securing Harness With RTV
2006-03-02 Radiator Panel Lift Fixture Proof Load Test
2006-02-28 M.L.I. Support Bracket Mis-matched Radius
2006-02-24 Preparing Radiator Pane Lift Fixturel For A Proof load test
2006-02-24 Tour Of Bldg. 33
2006-02-23 Accelerometer
2006-02-22 Harness
2006-02-17 N.R.L
2006-02-16 N.R.L
2006-02-15 N.R.L
2006-02-14 N.R.L
2006-02-06 Fabricated Antenna Fixture
2006-02-03 Preparing Fixture For Radiator Testing
2006-01-31 Radiator Panel Fixture Proof Test
2006-01-30 Thermistor Harness Shield Terminations
2006-01-24 Proof Load 15 Ton Crane
2006-01-20 Installed Two S.I.U.'s
2006-01-17 I & T Crane Scale
2006-01-13 LAT Test MGSE Test Stand
2006-01-09 X-LAT Plate Chiller Plumbing And Routing
2005-12-29 Bonding Thermistors And Accel'S To The X-LAT Plate
2005-12-20 Chiller Assembly
2005-12-19 X-LAT Plate Shim Bonding Samples
2005-12-07 Installing A Calorimeter With The G.L.A.S.T. Italian Team
2005-12-06 Tracker Installation Exercise With G.L.A.S.T. Italian Team Members
2005-12-05 Fixture To Support Heatpipes During Epoxy Removal
2005-12-05 GASU Installation & Initial Cables Mated
2005-11-23 I Guess We Were A Little Late
2005-11-23 Installing The ACD Onto The GRID
2005-11-22 Finalizing Thermistor, Heater, And Thermocouple, Harness Routing And Accelerometer Locations
2005-11-21 Moving The ACD Into Room 104
2005-11-17 Tracker Thermocouples Completed
2005-11-16 Tracker Thermocouple Installation
2005-11-15 Bonding Down Spout Heat Pipes
2005-11-14 Down Spout Heat Pipe Alignment Fixture
2005-11-11 Group Photos
2005-11-11 Fit Check The X-LAT Plate
2005-11-10 Down Spout Heat Pipes
2005-11-09 X-LAT Plate
2005-11-09 Photo Day
2005-11-04 Thermostat And Heater Harness
2005-11-04 LAT Cable Routings
2005-11-03 Thermostat And Heater Harness
2005-11-02 Accelerometer Testing
2005-10-31 Accelerometer Installation
2005-10-28 Bonding Ty-mounts
2005-10-27 Accelerometer Testing
2005-10-26 Harness Routing
2005-10-25 ACD Interface
2005-10-24 Thermistor Installation
2005-10-24 Crimp Pull Test
2005-10-21 Harness Routing
2005-10-20 EMI Shield Installation
2005-10-19 Sixteen Towers
2005-10-19 Initial Cable Routings
2005-10-18 Installing Tracker 15 Into Bay 3
2005-10-18 CAL-TEM-TPS Installed Into Bay 3
2005-10-17 Tracker Cable Repairs
2005-10-14 Receiving Tracker SN 15 From SFO
2005-10-14 Receiving Test Setup For Tracker SN 15
2005-10-14 Ice Cream Social
2005-10-14 Installing Calorimeter 117 Into Bay2
2005-10-12 Receiving Test For Tracker FM8
2005-10-12 Installing Tracker FM 14 Into Bay 2
2005-10-11 Installing Cable Trays
2005-10-10 Receiving Inspection For Tracker FM12
2005-10-10 Installing Calorimeters Into Bay's 6 & 7
2005-10-07 Installing Tracker Into Bay 7
2005-10-07 Installing Tracker Into Bay 6
2005-10-07 Preparing Tracker For Receiving Test
2005-10-05 Preparing GRID II For Shipping
2005-10-03 Installing Tracker SN 0011 Into The GRID
2005-10-03 Installing Calorimeter 114 Into Bay 15
2005-09-30 Grid Purge Flow Test
2005-09-30 Delivery From Lockheed
2005-09-29 Installing Tracker Into Bay 14
2005-09-29 Installing Calorimeter Into Bay 14
2005-09-28 CAL-TEM-TPS Assembly For Bay 6
2005-09-26 Receiving Trackers At SFO
2005-09-23 The LAT Bagged
2005-09-22 Installing CAL-TEM-TPS Into Bay 11
2005-09-21 Installing Tracker Into Bay 11
2005-09-21 Tracker SN 0010 Completed Receiving Test, Ready To Install Into Bay 14
2005-09-20 Bonding Heaters
2005-09-20 Installing A Tracker Into Bay 10
2005-09-16 Bonding Heaters On The Grid
2005-09-15 Weight Of Calorimeter Lift Fixture Components
2005-09-14 Receiving Inspection On Tracker No. 9
2005-09-14 Proof Load A.C.D. Lift Fixture
2005-09-14 Heater Bonding Samples
2005-09-13 Removing Cal-Tem-Tps sn 0011 From Metrology Bay Then Shimming Cal. 114
2005-09-13 Receiving Inspection On Tracker No. 7
2005-09-13 Proof Loading 15 Ton Crane
2005-09-13 Gasu - ACD Interface
2005-09-12 Installing TPS-TEM-Thermistor Harness On To Calorimeter SN 113
2005-09-09 Installing Calorimeter 113 Into Metrology Bay
2005-09-08 Final Prep For Moving The ACD Mock-up Into Rm. 104
2005-09-07 Building The A.C.D. Proof Weight Fixture
2005-09-06 Thermal Bond Testing
2005-09-05 Installing Calorimeter SN 112 Into The Metrology Bay and Thermistor Installation
2005-09-02 Cable Tray Installation
2005-09-01 Menning Plate Installation
2005-08-31 Crane upgrades
2005-08-30 Installing Thermistor Harness Into Bay's 0 & 4
2005-08-29 Replacing T.P.S. On Bay's 0 & 4
2005-08-26 ACD Mockup For Lift Fixture Exercises
2005-08-24 Building The ACD Mock-up
2005-08-13 Delivery Of The A.C.D
2005-08-11 Receiving Calorimeter from NRL
2005-08-11 Harness Cable Routings
2005-08-10 Kids Day At S.L.A.C
2005-08-05 Component Ground Test
2005-08-04 Install Tracker 6 Into Bay 12
2005-08-03 Install Calorimeter Into Bay 13
2005-08-02 Install Tracker 4 Into Bay 13
2005-08-01 Receiving Cross LAT Plate
2005-08-01 EMI Taping Tracker No 6
2005-07-29 EMI Fit Check 2
2005-07-29 Shear Plate Installation
2005-07-26 Thermistor Harness Installation
2005-07-26 Nut Splitting
2005-07-25 Receiving Inspection Tracker 6
2005-07-25 Height Gage
2005-07-23 Picking Up Tracker From SFO
2005-07-21 EMI Shield Kit
2005-07-20 EMI Skirt Fit Check
2005-07-20 Delivery From Lockheed Martin
2005-07-19 Receiving GRID 2
2005-07-11 ESD Bleed
2005-07-10 Thermo-Vac Test on Triple Joint Bond Test
2005-07-08 The Grid Purge Tube Routings and Flow Meter
2005-07-08 Shipping Calorimeter to NRL
2005-07-05 Thermal Test Samples
2005-07-05 TEM-TPS-CAL Ready For Bay 13
2005-07-05 E.G.S.E. G.A.S.U
2005-06-30 Installing Calorimeter 108 Into The Metrology Bay
2005-06-28 Taping EMI Shield On Tracker 4
2005-06-23 Thermal Testing
2005-06-23 Picking Up The Last Four Calorimeters From
2005-06-15 TPS Screw Holes
2005-06-15 Installing Shear Plates
2005-06-14 Post Grid Survey
2005-06-14 Correct Connector Hardware Reference
2005-06-14 Calorimeter Receiving Inspections
2005-06-13 Escorting Calorimeter Shipment From SFO To SLAC
2005-06-10 Installing CAL-TEM-TPS Into Bay 8
2005-06-10 2-56 ScrewTracker Cable Connectorss On
2005-06-09 Thermistor Harness For CAL-TEM-TPS 2559 SN 006
2005-06-09 Installing Calorimeter 107 Into Metrology Bay
2005-06-09 LAT Cooling
2005-06-08 Installing Tracker SN 5 Into Bay 8
2005-06-07 Receiving Inspection of Calorimeters
2005-06-07 Install Calorimeter SN 106 Into Bay 9
2005-06-07 Bonding Tracker Cables
2005-06-06 Picking Up Calorimeters At SFO
2005-06-06 Installing Tracker SN 3 Into Bay 9
2005-06-05 Shimming And Thermistor Bonding Cal 106
2005-06-03 Installing Calorimeter sn 106 Into Metrology Bay
2005-06-03 Electrical hazard
2005-06-02 Receiving Trackers from Delta @ SFO
2005-06-02 Bonding Copper Tubing For Axiliary Cooling System
2005-06-01 Auxiliary Cooling System Copper Tubing
2005-05-31 Cleaning Shear Plates
2005-05-31 Grid Bay Locations Reference Under The Rotation Stand
2005-05-26 Mating Bay 4 & 5 TEM-TPS Flight Cables
2005-05-26 Cold Check Of Flight Cables
2005-05-26 Bay 4 & 5 Flight Cables Mated
2005-05-25 Tracker 0, 1, 4, & 5 In The Grid
2005-05-25 Mating & Torque All Tracker Cables For First Four Bays
2005-05-25 Shimming & Installing Calorimeter 103 Into Bay 1
2005-05-24 Calorimeter 103 Thermistor Bonding - TEM-TPS Shimming
2005-05-20 Calorimeter 102 Thermistor Harness Bonding
2005-05-20 Metalic Particulate On Calorimeter 102 Harness
2005-05-20 Shimming Calorimeter 102-TEM-TPS
2005-05-20 Install Calorimeter 102 Into Metrology Bay
2005-05-19 Installing Tracker SN2 Into Bay 1
2005-05-19 Using PAP To Remove EM TEM-TPS
2005-05-19 First Four Trackers Installed
2005-05-19 Thermal Strap Doublers Warped
2005-05-18 Installing Thermal Strap Hardware
2005-05-18 Cable Clearance
2005-05-18 Bagging The Grid
2005-05-17 Installing Tracker 01 Into Bay 5
2005-05-16 Compare Flight Cables To EGSE Cables
2005-05-16 Prep Grid To Install Bays 1 & 5
2005-05-16 EM GASU-PDU-EGSE Cables On The Grid
2005-05-13 Completing Grid Thermistor Harness & Purge Channel Covers
2005-05-12 Modifying TEM-TPS Height On Blue Test Cart
2005-05-12 Crimping The Thermal Instrumentation On The Grid
2005-05-11 Freight Damage
2005-05-11 Connector Pin & Socket Damage
2005-05-10 Crimp
2005-05-09 Pull Testor and Crimping Tool
2005-05-09 Thermal Bonding
2005-05-06 Harness Routings
2005-05-03 Thermistor Harness Fit Check
2005-05-03 ROUTED TEST CABLES TO THE LAT
2005-05-02 Tracker SN 3 EMI Taping
2005-04-29 Data Taking With Muon Telescope
2005-04-28 Tracker Lift Fixture Proof Load
2005-04-26 G-Force Test With Data Logger
2005-04-25 Single Bay Plate Alignment Rod Interference
2005-04-23 Receiving Tracker SN 01 & 02
2005-04-22 Recieving Tracker Sn 01 @ SFO
2005-04-21 Installing Adapter Chrome Handle On Cart 3
2005-04-18 Routing and Installing E.G.S.E Cables
2005-04-18 Remove and Replace Tem Power Supply Simulation
2005-04-15 Bonding Coupon Results
2005-04-15 Kapton Taping Tracker B Flex Cables
2005-04-15 E.G.S.E. Installation
2005-04-14 Tower A E.M.I. Tape Repair
2005-04-14 Bonding Test Coupon CV2946
2005-04-13 Mass Simulator On To The Grid Complete
2005-04-12 Install Mass Simulators To The Grid
2005-04-11 Group Photo's
2005-04-08 Install Calorimeter 105 Into Bay 4
2005-04-08 Bonding Tracker B Flex cables
2005-04-08 Removal Of Calorimeter 105 From Single Bay Test Stand
2005-04-08 Pre-Removal Of Tracker B From Single Bay Test Stand
2005-04-08 Installation Of Tracker B Into The Grid
2005-04-08 I & T Tool Box Inventory
2005-04-07 Preparing Tracker For E.M.I. Testing
2005-04-07 Tracker Flex Cable Length NCR
2005-04-06 Tracker Shipping Prep. For E.M.I. Testing
2005-04-06 Tracker Cable Interference
2005-04-05 T.E.M. Electrical Testing
2005-04-05 Calorimeter Installation In to Bay Zero
2005-04-05 Continue Tracker A Cone Installation
2005-04-04 Preparation And Installation of Tracker A To Bay Zero
2005-04-02 Receiving Tracker sn 2
2005-04-01 Single Bay Fixture Proof Load
2005-03-31 Tooling Ball Nest Hole Damage
2005-03-31 GPR Corner Brackets After Modifications
2005-03-31 Data Taking With Am241
2005-03-30 Shims On Tracker B
2005-03-30 Install And Mate Calorimeter 105 To Tracker B
2005-03-29 Install Tracker B Into Single Bay Rotation Stand
2005-03-28 Remove G.P.R. From The Grid And Reinstall
2005-03-28 Moving The Grid And Rotation Stand Into Room 104
2005-03-28 Install G.P.R. And Grid Into Rotation Stand
2005-03-25 G.P.R. Removal And Replace Onto The Grid With ACD Interference Simulation
2005-03-24 Removing G.P.R. And Grid From The Rotation Stand
2005-03-23 Integrating the G.P.R. Into The Rotation Stand
2005-03-22 The Grid Final Inspection @ Bldg. 25
2005-03-21 G.P.R. Features @ Bldg. 25
2005-03-18 G.P.R. Rotation Stand Build-up
2005-03-17 Single Bay Rotation Stand Proof Load Test
2005-03-16 Moving The Rotation Stand From Bldg. 750 to Bldg. 33
2005-03-12 Machine Work On Single Bay Transition Flange
2005-03-11 Prepare Grid For Bldg. 25
2005-03-11 Proof Load G.P.R. and Move To Bldg. 25
2005-03-10 G.P.R. Assembly Prep
2005-03-10 EMI Qual Test Dummy Cal Gasket
2005-03-10 C.G. Of The Grid Calculation
2005-03-08 TEM PSU shimmed to Calorimeter 105
2005-03-07 Calorimeter 105 Into Metrology Bay
2005-03-04 Single Bay Lift Fixture Leveling Exercise
2005-03-03 Single Bay Rotation Stand Proof
2005-03-03 Grid Adapter Fit Check
2005-03-02 Prepare The Grid To Install Corner Brackets
2005-03-02 NCR 264 Repair And Radiator Corner Bracket Installation
2005-03-01 Build-up of 2nd Single Bay Rotation Stand
2005-02-28 Remove TEM-TPS From Calorimeter 107
2005-02-28 Remove TEM-TPS From Calorimeter 106
2005-02-25 Single Bay Lift Fixture Fit Check
2005-02-25 Calorimeter 105 TEM TPS Removal
2005-02-24 Single Bay Measurements
2005-02-24 Proof Load Weights
2005-02-24 Grid Thermistor and Purge Tube Bonding
2005-02-23 Receiving Calorimeter 6 & 7
2005-02-23 Fit New Check Single Bay
2005-02-23 ESD Ground On Blue Cart 2
2005-02-23 104 Crane Load Cell
2005-02-18 EMI Taping on Tracker B
2005-02-17 Removing Connector Savers from GLAT 1752
2005-02-17 Install Calorimeter into 1 x with tracker A
2005-02-16 The Grid
2005-02-15 The Grid Post Bake Out
2005-02-14 Prep for The Grid Bake Out
2005-02-14 Receiving Tracker B
2005-02-13 Transporting Tracker B from SFO to Stanford
2005-02-11 Install Tracker A into Single Bay
2005-02-10 Tracker Installation Readiness Review
2005 02-10 Tracker Lift Fixture Proof Test
2005-02-07 Transfer Single Bay To The Transportation Cart
2005-02-05 Tracker Lift Fixture Modification
2005-01-31 Forklift Proof Load
2005-01-31 Tracker Lift Fixture Comparison
2005-01-28 Oven Setup
2005-01-28 EMI Shield Tracker A
2005-01-27 EMI Shield Tracker A
2005-01-26 EMI Shield Practice
2005-01-25 EMI Shield Practice
2005-01-24 Practice EMI Taping
2005-01-24 Forklift
2005-01-23 Tracker EMI Shield Test
2005-01-21 Tracker EMI Shield Prep For Paint
2005-01-20 Forklift-Vac. Chamber
2005-01-19 Heatpipe Bonding
2005-01-18 Grid Rework
2005-01-15 Tracker Receiving
2005-01-11 4X4 Z Axis Horizontal Lift fixture
2005-01-10 Tracker Cable Bond Samples
2005-01-10 Receiving Calorimeters @ SFO
2005-01-07 Trace Tracker Cables in the 1 X 1
2005-01-06 Tracker Shipping Simulation
2005-01-05 Tracker Cables to Grid Templates Fit Check
2005-01-05 GPR To BSA
2005-01-05 Tracker Cable Bond Samples
2005-01-04 Tracker Cable Fit Check
2004-12-23 Tracker
2004-12-22 Peelable Shim Delaminiation
2004-12-22 Grid Interface Fit Check
2004-12-21 EM2 Calorimeter markings
2004-12-21 Fm 101 Calorimeter
2004-12-20 Vacuum Chamber integration
2004-12-20 Scintillator Stand Modification
2004-12-20 Obstacles on shipping container roofs
2004-12-14 Calorimeter Lift Fixture Proof Load
2004-12-07 Receiving Flight Calorimeter
2004-12-06 Hydraulic Lift
2004-12-03 Vacuum Chamber
2004-12-01 Proof load Tilt Table
2004-11-30 Test Crate
2004-11-24 Nickel Plate on Grid
2004-11-19 Shipping Tracker simulator Test
2004-11-19 Moving The Grid To The Tilt Table
2004-11-18 Van de Graaff Electronics Rack
2004-11-18 Grid in the Crate
2004-11-17 Breakout boxes and cables
2004-11-17 Integration platform control system
2004-11-17 Integration Stand Control System
2004-11-17 Integration Stand in Room 104
2004-11-16 Z Axis Lift Fixture
2004-11-12 Integration Stand PAP Weldment Status
2004-11-08 GRID DELIVERY
2004-11-02 Muon Telescope & EM
2004-11-01 CAL LAT-PS-03027
2004-10-14 Surveying The Tracker Simulator
2004-10-14 Damaged Connector Hardware
2004-10-12 Lift Fixture Turnbuckles
2004-10-12 Room 104 Crane Load Cell
2004-10-08 Scintillator Stand Modification
2004-10-07 Mini-Cal Installation into Rotating 1 x 1
2004-10-01 Install NRL Mockup into 4 X 4
2004-10-01 PSU-TEM Shimming
2004-10-01 Remove NRL Mockup From Metrology Bay
2004-09-30 Tracker Tower Simulator
2004-09-30 Install NRL Calorimeter Mockup Into Metrology bay
2004-09-29 Receiving NRL Calorimeter Mockup
2004-09-29 Hole In The Floor 104 Floor
2004-09-23 Grid Perimeter Ring
2004-09-23 Scintillator Stand
2004-09-23 Room 104 Crane
2004-09-23 Hot Knife Results
2004-09-23 T-Vac Forklift
2004-09-22 T-Vac Forklift
2004-09-22 LAT Lift Fixture
2004-09-15 Adjustable Integration Platform
2004-09-15 Scintillator stand
2004-09-03 Heater Bonding
2004-08-31 Tracker Installation Training
2004-08-31 Cone Installation Training
2004-08-26 Tracker Installation Training
2004-08-24 Moving Base Structure Assembly
2004-08-23 Tracker Cone Installation Tools
2004-08-20 Tracker Cone Installation
2004-08-18 Eric's Photos
2004-08-17 EM2 Deintegration
2004-08-13 Heat Pipe Bonding
2004-08-12 Tracker Lift Fixture
2004-08-12 Cable Tray Installation Day 2
2004-08-11 Tracker Inner Container Pull Test
2004-08-11 Multiple Tracker Simulator
2004-08-10 Checking Modified Tracker Lift Fixture
2004-08-09 Installing Cable Trays On Electrical Mockup
2004-08-06 Swapping EM Calorimeters for testing
2004-08-05 Prepare for post transport testing
2004-08-04 Calorimeter Receiving
2004-08-04 Proof Test Wt. Integration Stand
2004-08-04 Tracker Lift Fixtures
2004-07-29 Trainer Rotation Stand
2004-07-22 Cable Trays
2004-07-20 Shimming
2004-07-19 Air Bearings
2004-07-15 Shimming
2004-07-14 Forklift
2004-07-09 Radiator Panel Removal
2004-07-06 Proof Load Tracker Lift Fixture
2004-07-06 Installing Notched Cable Trays
2004-07-02 Radiator Heat Pipe Installation
2004-07-02 New Forklift
2004-07-02 1 X 4
2004-07-01 Menning Plate Epoxy Samples
2004-07-01 Connector
2004-07-01 Metrology Bay Fit Check
2004-06-29 Portable Cleanroom
2004-06-29 Air Bearings
2004-06-28 Tracker Fixture Fit Check
2004-06-28 Prep Tracker Mockup For Transport
2004-06-28 Prep EM2 for Transport To Bldg. 84
2004-06-28 Cable Trays Vs. Pan Poles
2004-06-25 I & T Mockup Tracker Tower Assembly
2004-06-25 Install EM2
2004-06-24 Tracker Lift Fixture
2004-06-24 Bonding Flexures
2004-06-23 Safe To Mates EM2
2004-06-22 EM2 Lift Fixture
2004-06-22 EM 2 Cage
2004-06-22 Cleanroom Crane
2004-06-18 EM1 SETUP
2004-06-17 Calorimeter Installation
2004-06-17 Prep for Calorimeter Installation.
2004-06-17 Van de Graaff
2004-06-16 Van de Graaff
2004-06-16 Mini Tower Installation
2004-06-16 Light Tight
2004-06-15 Tracker Prep
2004-06-15 1x1 Bay
2004-06-14 Shear Plate Removal
2004-06-14 Calorimeter Removal
2004-06-07 Install Tray in Tracker
2004-06-03 Cable Trays vs. Pan Poles
2004-06-01 Cable Trays vs. Pan Poles
2004-05-24 Cable Trays vs. Pan Poles
2004-05-21 Cable Trays vs. Pan Poles
2004-05-20 Cable Tie Downs
2004-05-20 Tracker
2004-05-18 Calorimeter Install
2004-05-13 Opening Clean Room Doors
2004-05-11 The Electrical Mockup
2004-05-11 Wooden Mockup
2004-05-10 Wooden Mockup
2004-05-07 Wooden Mockup
2004-05-06 1x4
2004-05-03 Metrology Bay
2004-04-30 Metrology Bay
2004-04-28 Calorimeter Install
2004-04-22 Training Grid
2004-04-20 Training Grid
2004-04-07 TEM, SIU, Buildup
2004-03-31 Clean Room Crane
2004-03-29 Populating The Grid
2004-03-26 Rotating Dolly
2003-10-14 EM CAL de-integration
2003-10-07 Van de Graaff setup
2003-10-02 Lead bricks
2003-09-26 EM TEM modification
2003-09-19 EM CAL Integration into single bay
2003-09-03 EM Integration
2003-08-28 EM Integration MGSE
2003-08-28 EM Integration
2003-08-27 EM Integration
2003-08-24 EM Tracker Mini Tower on bench at SLAC
2003-08-12 EM Calorimeter at SLAC