| Agenda and Charge | L. Klaisner |
| M. Campell | |
| D. Thompson | |
| N. Johnson | |
| Tracker | R. Johnson |
| Electronics | G. Haller |
| I&T | E. Bloom |
| Agenda and Charge | L. Klaisner |
| S. Ritz | |
| Electronics | G. Haller |
| I&T | E. Bloom |
| Systems Engineering | D. Horn |
| Agenda and Charge | L. Klaisner |
| LAT Online Trade Charts | D. Lung |
| Electronics Charts | M. Huffer/G. Haller |
| Agenda and Charge | L. Klaisner |
| Thermal Presentation | J. Wang |
| Agenda and Charge | L. Klaisner |
| LAT Structural Overview | M. Nordby |
| Agenda and Charge | L. Klaisner |
| Peer Review and CDR Prep | D. Lung |
| Agenda and Charge | L. Klaisner |
| EEE Parts and Electronic Packaging Program Status | N. Virmani |
| EEE Parts Selection and Procurement Information | N. Virmani |
| Agenda and Charge | L. Klaisner |
| Technical Status for Lehman Review | L. Klaisner |
| Dynamics Test Planning | M. Nordby/Y. Ismail/J. Ku |
| Agenda and Charge | L. Klaisner |
| Mechanical Materials and Parts | J. Tice |
| Cal Plate Mounting Trade Study | M. Nordby |
| X-LAT to Electronic Boxes Thermal Joint Trade Study | G. Lam |
| Agenda and Charge | L. Klaisner |
| Flight Hardware Buy Status | L. Klaisner |
| DAQ Electronics Flight Buys | G. Haller |
| Tracker Bottom Tray Design | T. Borden |
| Agenda and Charge | L. Klaisner |
| Mechanical Materials and Parts Status | J. Tice |
| Agenda and Charge | L. Klaisner |
| Subsystem Risk Review | B. Marcellini |
| Agenda and Charge | L. Klaisner |
| LAT Assembly Sequence | L. Wai |
| Agenda and Charge | L. Klaisner |
| J. Clinton | |
| Performance and Safety Assurance | D. Marsh |
| Agenda and Charge | L. Klaisner |
| Revisions to the Tracker Tray Design | R. Johnson/T.Borden |
| LAT Mini Tower - I&T Story | E. do Couto de Silva |
| Agenda and Charge | L. Klaisner |
| Draft Presentation to the JOG | L.Klaisner |
| I&T&C Subsystem EM Plans, over the next three months | E. Bloom |
| Agenda | J. Martin |
| Proposed Bldg. 33 Layout | L. Wai |
| Status of Action Items from Subsystem Manager Meeting | N. Johnson/G. Haller/R. Johnson |
| EM Staffing Plan | G. Grist/L. Wai |
| EM Daily Meetings | E. Bloom |
| Tower EM Support Plan | D. Horn |
| Acceptance Data Test Plan Requirements | T. Leisgang |
| Agenda and Information | J. Martin |
| EM Staffing Plan | E. do Cuoto de Silva |
| IFCT Status | L. Wai |
| Agenda | J. Martin |
| EM Data Package | T.Leisgang |
| EM Status | B. Grist |
| HW Handling | J. Clinton |
| Tool Control | J. Clinton |
| Tracker Mini Tower Pre-Ship Review | Nanda Menon |
| Discussion Items | Nanda Menon |
| I&T Operations Meeting | |
| Review of the status of preparations for Tracker Flex Cable PRR | H. Sadrozinski |
| I&T Operations | E. Bloom/B. Grist |
| LAT EMI Requirements | F. Blanchette |
| LAT EMI Issues and Resolution | F. Blanchette |
| EMI/EMC Design Approach | D. Nelson |
| Impact of Changes on Production Schedule for Mechanical Structures | M. Campell |
| Mechanical System Integration Issues | M. Nordby |
| Plan for Closure of EMI Issues | F. Blanchette |
| Tracker Update - Flex Cable | H. Sadrozinski |
| Flex Cable Action Item and Issues List | L. Lee |
| Tracker Cable Interface Status | M. Nordby |
| EMI Issues List | F. Blanchette |
| EMI Operations | L. Wai |
| Agenda | J. Martin |
| EMI/EMC | F. Blanchette |
| Configuration Management | P. Hascall |
| I&T Operations and EM Status | L. Wai/H.Tajima/J.Panetta/E.do Couto e Silva |
| Key Issues Status | P. Hascall |
| Key Action Status | P. Hascall |
| Plans for EM Data Analysis | E. do Couto e Silva |
| Action Item Review | P. Hascall |
| Tracker Design Review | M. Nordby |
| Issues | P. Hascall |
| Proposed ACD Interface Change | P. Hascall |
| LAT Test Plan Update | T. Leisgang |
| Connector Relocate | D. Thompson |
| CCB Mass Allocation | |
| TDA to TSA Mounting Issues | K. Segal |
Tuesday, December 2 , 2003 8:00 a.m.
| Overview of Tracker EM Testing to date | R. Johnson |
| Status of Engineering Meeting Issues/actions | P. Hascall |
| Status of EMI/EMC Issues/Actions | F. Blanchette |
| Summary of GTRC7 Review and RFAs | H. Sadrozinski |
| Status and closure plan for EMI Actions | Fred Blanchette |
| Preparation for the ISOC Peer Review | Dave Lung |
| Status of Tracker EM Testing | Robert Johnson |
| LAT Equipment EMI Requirements | Fred Blanchette |
| Agenda | |
| Material Review Board (MRB) Meeting for the ACD GARC ASIC issue | Darren Marsh |
|
|
G. Haller |
| ACD FREE MRB | G. Shiblie |
| LAT Environmental Specifications Update | J. Ku/L. Lee |
| Light Tight Requirement Discussion | P. Hascall |
| Tracker and LAT Survey and Alignment Planning | M. Nordby |
| CCHP MRB | S. Herzberg |
| New Configuration Management System for CAD Models | Rob Black |
| Proposed CM System and Process Changes | Pat Hascall |
| E2E Report | Mike Huffer |
| Presentation | Mike Huffer |
| Data Handling Working Website |
| Investigation of TKR large cluster events | Hiro Tajima |
| Safe to Mate Procedure | Ken Fouts |
| LAT Instrumentation Plan | Leonard Lee |
| Accelerometer Review | John Ku |
| Table 1 Flight Instrumentation | Jack Goodman |
| Table 3 Test Instrumentation (pg 1) (pg 2) | Jack Goodman |
| GLAST FSW IDT | J.J. Russell |
| NASA Presentation on ESD | B. Graf |
| FSW charge injection functions and discuss/recommend changes/clarifications with ACD, TKR, & CAL representatives | JJ Russell |
| Where to put Towers A and B in the Grid | E. Bloom |
| Assembly of First Towers | L. Wai |
| LAT Integration Sequence | M. Nordby |
| End to End Committee Test Plans | Eduardo do Couto e Silva |
| LAT Survey and Alignment Interim Results | M. Nordby |
Debbie Nicholson, Last Modified: 07/11/2005 16:17