LAT Engineering Meeting

Past Presentations


Tuesday, October 15, 2002 - Engineering Model

Agenda and Charge L. Klaisner
M. Campell

ACD

D. Thompson
N. Johnson
Tracker R. Johnson
Electronics G. Haller
I&T E. Bloom

Tuesday, October 29, 2002 - End to End Instrument Level Testing

Agenda and Charge L. Klaisner
S. Ritz
Electronics G. Haller
I&T E. Bloom
Systems Engineering D. Horn

Tuesday, November 5, 2002 - Electronic Engineering Models and Test Bed

Agenda and Charge L. Klaisner
LAT Online Trade Charts D. Lung
Electronics Charts M. Huffer/G. Haller

Tuesday, November 19, 2002 - LAT Thermal Analysis

Agenda and Charge L. Klaisner
Thermal Presentation J. Wang

Tuesday, December 10, 2002 - LAT Structural Analysis and Specifications

Agenda and Charge L. Klaisner
LAT Structural Overview M. Nordby

Tuesday, December 17, 2002 - Plans and Status for the LAT CDR

Agenda and Charge L. Klaisner
Peer Review and CDR Prep D. Lung

Tuesday, January 14, 2003 - EEE Parts and Packaging

Agenda and Charge L. Klaisner
EEE Parts and Electronic Packaging Program Status N. Virmani
EEE Parts Selection and Procurement Information N. Virmani

Tuesday, January 21, 2003 - Technical Status for Lehman Review/Proposed Changes to Dynamics Test Plan

Agenda and Charge L. Klaisner
Technical Status for Lehman Review L. Klaisner
Dynamics Test Planning M. Nordby/Y. Ismail/J. Ku

Tuesday, January 28, 2003 - Mechanical Materials and Parts

Agenda and Charge L. Klaisner
Mechanical Materials and Parts J. Tice
Cal Plate Mounting Trade Study M. Nordby
X-LAT to Electronic Boxes Thermal Joint Trade Study G. Lam

Tuesday, February 4, 2003 - Near Term Flight Hardware Buys/Status of TKR Bottom Tray Design

Agenda and Charge L. Klaisner
Flight Hardware Buy Status L. Klaisner
DAQ Electronics Flight Buys G. Haller
Tracker Bottom Tray Design T. Borden

Tuesday, February 11, 2003 -  Materials and Processes Program

Agenda and Charge L. Klaisner
Mechanical Materials and Parts Status J. Tice

Tuesday, February 25, 2003 -  Subsystem Risk Review

Agenda and Charge L. Klaisner
Subsystem Risk Review B. Marcellini

 

Tuesday, March 11, 2003 -  LAT Assembly Sequence

Agenda and Charge L. Klaisner
LAT Assembly Sequence L. Wai

Tuesday, April 1, 2003 - Manufacturing Preparation

Agenda and Charge L. Klaisner
J. Clinton
Performance and Safety Assurance D. Marsh

 

Tuesday,  May 20, 2003 - Revisions to the Tracker Tray Design

Agenda and Charge L. Klaisner
Revisions to the Tracker Tray Design R. Johnson/T.Borden

Tuesday,  June 10, 2003 - LAT Mini Tower

LAT Mini Tower - I&T Story E. do Couto de Silva

 

Tuesday,  July 8, 2003 -  Draft Presentation to the JOG

Agenda and Charge L. Klaisner
Draft Presentation to the JOG L.Klaisner

Tuesday,  July 22, 2003 -  I&T&C Subsystem EM Plans, over the next three months

   
I&T&C Subsystem EM Plans, over the next three months E. Bloom

Tuesday,  July 29, 2003 -  (See below)

Agenda J. Martin
Proposed Bldg. 33 Layout L. Wai
Status of Action Items from Subsystem Manager Meeting N. Johnson/G. Haller/R. Johnson
EM Staffing Plan G. Grist/L. Wai
EM Daily Meetings E. Bloom
Tower EM Support Plan D. Horn
Acceptance Data Test Plan Requirements T. Leisgang

 

Tuesday,  August 5, 2003 -  EM Effort

Agenda and Information J. Martin
EM Staffing Plan E. do Cuoto de Silva
IFCT Status L. Wai

Tuesday,  August 12, 2003 -  EM Status

Agenda J. Martin
EM Data Package T.Leisgang
EM Status B. Grist
HW Handling J. Clinton
Tool Control J. Clinton

Tuesday,  August 19, 2003         8:00 a.m.

Tracker Mini Tower Pre-Ship Review Nanda Menon
Discussion Items Nanda Menon

Tuesday,  August 26, 2003         8:00 a.m.

 Action Items

I&T Operations Meeting  
Review of the status of preparations for Tracker Flex Cable PRR H. Sadrozinski

Tuesday,  September 2, 2003         8:00 a.m.

 Action Items

I&T Operations E. Bloom/B. Grist
LAT EMI Requirements F. Blanchette
LAT EMI Issues and Resolution F. Blanchette
EMI/EMC Design Approach D. Nelson
Impact of Changes on Production Schedule for Mechanical Structures M. Campell
Mechanical System Integration Issues M. Nordby
Plan for Closure of EMI Issues F. Blanchette

 

Tuesday,  September 9, 2003         8:00 a.m.

Action Items

Tracker Update - Flex Cable H. Sadrozinski
Flex Cable Action Item and Issues List L. Lee
Tracker Cable Interface Status M. Nordby
EMI Issues List F. Blanchette
EMI Operations L. Wai

Tuesday,  September 30, 2003         8:00 a.m.

 Action Items

Agenda J. Martin
EMI/EMC F. Blanchette
Configuration Management P. Hascall
I&T Operations and EM Status L. Wai/H.Tajima/J.Panetta/E.do Couto e Silva

Tuesday,  October 21, 2003         8:00 a.m.  

Action Items

Key Issues Status P. Hascall
Key Action Status P. Hascall
Plans for EM Data Analysis E. do Couto e Silva
   

 Tuesday,  October , 2003         8:00 a.m.  

Action Items

Action Item Review P. Hascall
Tracker Design Review M. Nordby

 Tuesday, November 4,  2003         8:00 a.m.  

 Action Items

Issues P. Hascall
Proposed ACD Interface Change P. Hascall
LAT Test Plan Update T. Leisgang
Connector Relocate D. Thompson

Tuesday, November  18, 2003         8:00 a.m.  

CCB Mass Allocation  
TDA to TSA Mounting Issues K. Segal
   
 

 

Tuesday, December 2 , 2003         8:00 a.m.  

 

Overview of Tracker EM Testing to date R. Johnson
Status of Engineering Meeting Issues/actions P. Hascall
Status of EMI/EMC Issues/Actions F. Blanchette
Summary of GTRC7 Review and RFAs H. Sadrozinski

Tuesday, December 9, 2003            8:00 a.m.

Status and closure plan for EMI Actions Fred Blanchette
Preparation for the ISOC Peer Review Dave Lung
Status of Tracker EM Testing Robert Johnson

Tuesday, March 2, 2004         8:00 a.m.  

LAT Equipment EMI Requirements Fred Blanchette

Tuesday, March 9, 2004         8:00 a.m.  

Agenda  
Material Review Board (MRB) Meeting for the ACD GARC ASIC issue Darren Marsh
G. Haller
ACD FREE MRB G. Shiblie
 

Tuesday, March 16, 2004         8:00 a.m.  

LAT Environmental Specifications Update J. Ku/L. Lee
   

Tuesday, March 23, 2004                8:00 a.m.  

Light Tight Requirement Discussion P. Hascall
 

Tuesday, April 20, 2004                8:00 a.m.  

Tracker and LAT Survey and Alignment Planning M. Nordby

Tuesday, May 4, 2004                    8:00 a.m.

CCHP MRB S. Herzberg

Tuesday, June 29, 2004                8:00 a.m.  

New Configuration Management System for CAD Models Rob Black
Proposed CM System and Process Changes Pat Hascall

Tuesday, July 6, 2004                8:00 a.m.  

E2E Report Mike Huffer
Presentation Mike Huffer
Data Handling Working Website

Tuesday, August 3, 2004                8:00 a.m.  

Investigation of TKR large cluster events Hiro Tajima
   

Tuesday, August  24, 2004                8:00 a.m.  

Safe to Mate Procedure Ken Fouts
   
   

Tuesday, August  31, 2004                8:00 a.m.  

LAT Instrumentation Plan Leonard Lee
Accelerometer Review John Ku
Table 1 Flight Instrumentation Jack Goodman
Table 3 Test Instrumentation (pg 1)  (pg 2) Jack Goodman

Tuesday,  October 5, 2004                8:00 a.m.  

GLAST FSW IDT J.J. Russell

Tuesday,  November 2, 2004                8:00 a.m.  

NASA Presentation on ESD B. Graf

Tuesday,  November 23, 2004                8:00 a.m.  

FSW charge injection functions and discuss/recommend changes/clarifications with ACD, TKR, & CAL representatives JJ Russell
 

Tuesday, January 18 , 2005               8:00 a.m.  

Where to put Towers A and B in the Grid E. Bloom
Assembly of First Towers L. Wai

Tuesday, January 25 , 2005               8:00 a.m.  

LAT Integration Sequence M. Nordby
   

Tuesday, March 8 , 2005               8:00 a.m.  

End to End Committee Test Plans Eduardo do Couto e Silva

Tuesday,  June 28, 2005               8:00 a.m.  

LAT Survey and Alignment Interim Results M. Nordby

 

 

 

 


Debbie Nicholson, Last Modified: 07/11/2005 16:17