Agenda and Charge | L. Klaisner |
M. Campell | |
D. Thompson | |
N. Johnson | |
Tracker | R. Johnson |
Electronics | G. Haller |
I&T | E. Bloom |
Agenda and Charge | L. Klaisner |
S. Ritz | |
Electronics | G. Haller |
I&T | E. Bloom |
Systems Engineering | D. Horn |
Agenda and Charge | L. Klaisner |
LAT Online Trade Charts | D. Lung |
Electronics Charts | M. Huffer/G. Haller |
Agenda and Charge | L. Klaisner |
Thermal Presentation | J. Wang |
Agenda and Charge | L. Klaisner |
LAT Structural Overview | M. Nordby |
Agenda and Charge | L. Klaisner |
Peer Review and CDR Prep | D. Lung |
Agenda and Charge | L. Klaisner |
EEE Parts and Electronic Packaging Program Status | N. Virmani |
EEE Parts Selection and Procurement Information | N. Virmani |
Agenda and Charge | L. Klaisner |
Technical Status for Lehman Review | L. Klaisner |
Dynamics Test Planning | M. Nordby/Y. Ismail/J. Ku |
Agenda and Charge | L. Klaisner |
Mechanical Materials and Parts | J. Tice |
Cal Plate Mounting Trade Study | M. Nordby |
X-LAT to Electronic Boxes Thermal Joint Trade Study | G. Lam |
Agenda and Charge | L. Klaisner |
Flight Hardware Buy Status | L. Klaisner |
DAQ Electronics Flight Buys | G. Haller |
Tracker Bottom Tray Design | T. Borden |
Agenda and Charge | L. Klaisner |
Mechanical Materials and Parts Status | J. Tice |
Agenda and Charge | L. Klaisner |
Subsystem Risk Review | B. Marcellini |
Agenda and Charge | L. Klaisner |
LAT Assembly Sequence | L. Wai |
Agenda and Charge | L. Klaisner |
J. Clinton | |
Performance and Safety Assurance | D. Marsh |
Agenda and Charge | L. Klaisner |
Revisions to the Tracker Tray Design | R. Johnson/T.Borden |
LAT Mini Tower - I&T Story | E. do Couto de Silva |
Agenda and Charge | L. Klaisner |
Draft Presentation to the JOG | L.Klaisner |
I&T&C Subsystem EM Plans, over the next three months | E. Bloom |
Agenda | J. Martin |
Proposed Bldg. 33 Layout | L. Wai |
Status of Action Items from Subsystem Manager Meeting | N. Johnson/G. Haller/R. Johnson |
EM Staffing Plan | G. Grist/L. Wai |
EM Daily Meetings | E. Bloom |
Tower EM Support Plan | D. Horn |
Acceptance Data Test Plan Requirements | T. Leisgang |
Agenda and Information | J. Martin |
EM Staffing Plan | E. do Cuoto de Silva |
IFCT Status | L. Wai |
Agenda | J. Martin |
EM Data Package | T.Leisgang |
EM Status | B. Grist |
HW Handling | J. Clinton |
Tool Control | J. Clinton |
Tracker Mini Tower Pre-Ship Review | Nanda Menon |
Discussion Items | Nanda Menon |
I&T Operations Meeting | |
Review of the status of preparations for Tracker Flex Cable PRR | H. Sadrozinski |
I&T Operations | E. Bloom/B. Grist |
LAT EMI Requirements | F. Blanchette |
LAT EMI Issues and Resolution | F. Blanchette |
EMI/EMC Design Approach | D. Nelson |
Impact of Changes on Production Schedule for Mechanical Structures | M. Campell |
Mechanical System Integration Issues | M. Nordby |
Plan for Closure of EMI Issues | F. Blanchette |
Tracker Update - Flex Cable | H. Sadrozinski |
Flex Cable Action Item and Issues List | L. Lee |
Tracker Cable Interface Status | M. Nordby |
EMI Issues List | F. Blanchette |
EMI Operations | L. Wai |
Agenda | J. Martin |
EMI/EMC | F. Blanchette |
Configuration Management | P. Hascall |
I&T Operations and EM Status | L. Wai/H.Tajima/J.Panetta/E.do Couto e Silva |
Key Issues Status | P. Hascall |
Key Action Status | P. Hascall |
Plans for EM Data Analysis | E. do Couto e Silva |
Action Item Review | P. Hascall |
Tracker Design Review | M. Nordby |
Issues | P. Hascall |
Proposed ACD Interface Change | P. Hascall |
LAT Test Plan Update | T. Leisgang |
Connector Relocate | D. Thompson |
CCB Mass Allocation | |
TDA to TSA Mounting Issues | K. Segal |
Tuesday, December 2 , 2003 8:00 a.m.
Overview of Tracker EM Testing to date | R. Johnson |
Status of Engineering Meeting Issues/actions | P. Hascall |
Status of EMI/EMC Issues/Actions | F. Blanchette |
Summary of GTRC7 Review and RFAs | H. Sadrozinski |
Status and closure plan for EMI Actions | Fred Blanchette |
Preparation for the ISOC Peer Review | Dave Lung |
Status of Tracker EM Testing | Robert Johnson |
LAT Equipment EMI Requirements | Fred Blanchette |
Agenda | |
Material Review Board (MRB) Meeting for the ACD GARC ASIC issue | Darren Marsh |
|
G. Haller |
ACD FREE MRB | G. Shiblie |
LAT Environmental Specifications Update | J. Ku/L. Lee |
Light Tight Requirement Discussion | P. Hascall |
Tracker and LAT Survey and Alignment Planning | M. Nordby |
CCHP MRB | S. Herzberg |
New Configuration Management System for CAD Models | Rob Black |
Proposed CM System and Process Changes | Pat Hascall |
E2E Report | Mike Huffer |
Presentation | Mike Huffer |
Data Handling Working Website |
Investigation of TKR large cluster events | Hiro Tajima |
Safe to Mate Procedure | Ken Fouts |
LAT Instrumentation Plan | Leonard Lee |
Accelerometer Review | John Ku |
Table 1 Flight Instrumentation | Jack Goodman |
Table 3 Test Instrumentation (pg 1) (pg 2) | Jack Goodman |
GLAST FSW IDT | J.J. Russell |
NASA Presentation on ESD | B. Graf |
FSW charge injection functions and discuss/recommend changes/clarifications with ACD, TKR, & CAL representatives | JJ Russell |
Where to put Towers A and B in the Grid | E. Bloom |
Assembly of First Towers | L. Wai |
LAT Integration Sequence | M. Nordby |
End to End Committee Test Plans | Eduardo do Couto e Silva |
LAT Survey and Alignment Interim Results | M. Nordby |
Debbie Nicholson, Last Modified: 07/11/2005 16:17