January 27, 2005
January 27, 2005
Agenda | D. Horn |
Project Status Overview (ppt) (pdf) | L. Klaisner |
System Engineering Status and Action Items (ppt) (pdf) | P. Hascall |
Calorimeter (ppt) (pdf) | N. Johnson |
DAQ/EGSE Hardware (ppt) (pdf) | G. Haller |
FSW (ppt) (pdf) ISIS (ppt) (pdf) | J. Fisher/J. Thayer |
Design Integration and Analysis (ppt) (pdf) | M. Nordby |
ACD (ppt) (pdf) | T. Johnson |
Mechanical (ppt) (pdf) /Thermal Hardware LM (ppt) (pdf) | M. Campell |
EPO (ppt) (pdf) | S. Silva |
I&T (ppt) (pdf) | E. Bloom/K. Fouts |
Tracker (ppt) (pdf) Trace Cracking (ppt) (pdf) | P. Drell/C. Young |
PSA (ppt) (pdf) | D. Marsh |
SAS (ppt) (pdf) | R. Dubois |
ISOC (ppt) (pdf) | R. Cameron |
Debbie Nicholson, Last Modified: 07/11/2005 16:17