
January 27, 2005
January 27, 2005
| Agenda | D. Horn |
| Project Status Overview (ppt) (pdf) | L. Klaisner |
| System Engineering Status and Action Items (ppt) (pdf) | P. Hascall |
| Calorimeter (ppt) (pdf) | N. Johnson |
| DAQ/EGSE Hardware (ppt) (pdf) | G. Haller |
| FSW (ppt) (pdf) ISIS (ppt) (pdf) | J. Fisher/J. Thayer |
| Design Integration and Analysis (ppt) (pdf) | M. Nordby |
| ACD (ppt) (pdf) | T. Johnson |
| Mechanical (ppt) (pdf) /Thermal Hardware LM (ppt) (pdf) | M. Campell |
| EPO (ppt) (pdf) | S. Silva |
| I&T (ppt) (pdf) | E. Bloom/K. Fouts |
| Tracker (ppt) (pdf) Trace Cracking (ppt) (pdf) | P. Drell/C. Young |
| PSA (ppt) (pdf) | D. Marsh |
| SAS (ppt) (pdf) | R. Dubois |
| ISOC (ppt) (pdf) | R. Cameron |
Debbie Nicholson, Last Modified: 07/11/2005 16:17