GLAST LAT Delta PDR/Baseline Review

July 30 - August 1, 2002

Presentation Material


Tuesday, July 30, 2002 - Plenary Sessions

GLAST Mission Overview L. Citrin
P. Michelson

Management, Cost, Schedule

W. Althouse
S. Ritz

Tuesday/Wednesday, July 30-31, 2002 - Breakout Sessions

Tracker (WBS 4.1.4) R. Johnson
Calorimeter (WBS 4.1.5) N. Johnson
Anti-Coincidence Detector (WBS 4.1.6) D. Thompson/T. Johnson
Electronics, Data Acquisition and Flight Software (WBS 4.1.7) G. Haller/JJ Russell
Mechanical Systems (WBS 4.1.8) M. Nordby
Systems Engineering (WBS 4.1.2) T. Thurston
Instrument Integration and Testing (WBS 4.1.9) E. Bloom/B. Grist
Performance and Safety Assurance (WBS 4.1.A) D. Marsh
Instrument Operation Center (WBS 4.1.B) D. Lung
Science Analysis Software (WBS 4.1.D) R. Dubois
Education and Public Outreach (WBS 4.1.C) P. Plait

    

 