EM Tower
Post 0dB Random Vibration Test Inspection Plan
25th
November 2003
-
Place
the tower on the table in an upside-down position (assembly configuration);
-
Perform
a visual inspection with pictures;
-
Remove
the cable holder brackets;
-
Visual
inspection of the flexure screws;
-
Remove
the bottom frame;
-
Control
the torque of the flexure screws;
-
Control
the torque on the –X side-wall screws;
-
Remove
–X side-wall
-
Perform
visual inspection of the inserts of the trays;
-
Re-mount
the –X side-wall;
-
Report
findings to MRB.
Attendees are INFN-Pisa, INFN-Bari, SLAC-Pisa, GSFC.