Notes from the TKR flex
cable meeting Tuesday, March 9, 9:30 am – 12 noon
Attending: Tim O'Herron,
Manuel Trigos, Andrew Zachoszcz, Martin Nordby, Arthur Scholz, Hartmut
Sadrozinski, David Nelson, Jim Martin
Thanks again to Tim for the
excellent job in getting the cables on track!
Action items:
- Size of Panel used by Parlex and useable
space: Dave Nelson
- Make decal for Thermistor, send to
Manuel, add to gerber file and make sure of orientation on cable: Dave
Nelson/Mike Hulligan
- Send .pdf files of layouts to Dave
Nelson and Hartmut after first full iteration with Mike Hulligan: Manuel
Trigos
- Check if a fit check using dummy cables
(from ~10 mil CFR4) on EM can be
done (connectors!) and be arranged in time: Jim Martin
- Check that existing top end of C4/C5
leaves enough room for routing of traces:
Dave Nelson
- Check with Sandro if he needs both C0 AND
C1 cables for stack testing: Hartmut
- Check status of C0 order: Jerry Clinton
- Release of C0 drawings: Martin Nordby
- Replace C0 drawings at Parlex with new,
released drawings? Martin Nordby/Jerry
Clinton
- Change from black to white ink on top
and bottom silk screen: David Nelson