Tracker Peer Review

March 24-25, 2003

Room 234 
Dial in No: 973-321-2000 
Passcode/Conference Code: 7020550 

Chairman: Lowell Klaisner  
Co-Chairman: John Deily
Members: Marty Breidenbach Jim Ryan
Tom McCarthy Helmuth Spieler
Ben Rodini  

RFAs and Responses

Link to the LAT Tracker documents referenced in the Tracker presentations.

Schedule

Session Time Presentations Topic
Monday morning 8:00 to 9:30 Section 1A - 1C Introduction
9:45 to 11:30 Section 2A - 2C Electronics Design
Monday afternoon 12:30 to 2:30 Section 2D - 2F Mechanical Design
2:30 to 3:00 Section 3A - 3B Engineering Model
3:15 to 3:45 Section 4A Mission Assurance
3:45 to 5:00 Section 5A - 5E Parts & Materials
Tuesday morning 8:00 to 10:00 Section 6A - 6H Fabrication
10:15 to 11:45 Section 7A - 7E Testing & Calibration
Tuesday afternoon 1:00 to 2:30 Section 7F  Calibration & Overflow
2:30 to 4:15   Discussions; executive session
4:15 to 5:00   Closeout
Detailed Agenda & Presentations
Section  No. Title Presenter Time Allocation File
1 A Introduction, Overview, and Status R. Johnson 30 min ppt
B Schedule Summary; Critical Paths; Risk T. Borden 25 ppt
C Performance Predictions vs Requirements W. Atwood 30  ppt
2 A Electronics Design and Status R. Johnson 45 ppt
B Radiation Testing H. Sadrozinski 20 ppt
C SSD/Electronics FMEA H. Sadrozinski 25 ppt
D Mechanical Design and Status Overview T. Borden 15 ppt
E Structural design and modeling E. Swensen 75  ppt
F Thermal modeling E. Osborne 15 ppt
3 A Engineering Model Tower Status T. Borden 10 ppt
B EM Mini-Tower Status and Results R. Johnson 25   ppt
4 A Mission Assurance N. Virmani 30 ppt
5 A Parts and Materials Procurement Overview T. Borden  10 ppt
B EEE Parts and Electronics Packaging N. Virmani  30  ppt
C SSD Procurement H. Sadrozinski  15 ppt
D ASIC Procurement R. Johnson  15 ppt
E Mechanical Parts and Materials T. Borden  15 ppt
6 A Fabrication Overview R. Johnson  5 ppt
B SSD Receiving and Inspection A. Brez 15 ppt
C Ladder Fabrication A. Brez 15   ppt
D Composite Panel Fabrication T. Borden 15 ppt
E MCM Fabrication R. Johnson 15 ppt
F Tray Assembly A. Brez 15  ppt
G Tower Module Assembly A. Brez 15  ppt
H Tower Module Shipping and Storage T. Borden 10 ppt
7 A Test Plan Overview R. Johnson  10 ppt 
B EGSE and MGSE R. Johnson  5 ppt
C Electronics Module Testing R. Johnson  10 ppt
D Panel and Tray Testing N. Mazziotta  20  ppt
E Tower Testing N. Mazziotta 25   ppt
E2 Engineering Model Testing N. Mazziotta 30 ppt
F On-Orbit Calibration and Test W. Atwood

20

ppt