LAT Tracker Presentations
(Not Comprehensive)
Subject | Author | Where | When | Files |
GLAST LAT Project Overview | Robert Johnson | Elba SpacePart | May 18, 2002 |
(pdf) |
LAT Tracker Construction in Italy | Ronaldo Bellazzini | Elba SpacePart | May 18, 2002 |
(pdf) |
Briefing on Prototype Tower Testing | Robert Johnson | SLAC | June 19, 2002 |
(pdf) |
Proto Tower Vibe Test Results and FEA | Erik Swensen | SLAC | June 19, 2002 |
(pdf) |
GLAST LAT Silicon-Strip Tracker | Robert Johnson | SPIE, Seattle | July 9, 2002 |
(ppt) |
Delta-PDR Tracker Presentation | Robert Johnson | SLAC | July 30, 2002 |
(ppt) |
Tracker EM plan | Robert Johnson | SLAC | October 14, 2002 |
(ppt) |
Quarterly Review Presentation | Robert Johnson | SLAC | November 12, 2002 |
(pdf) (ppt) |
Bottom Tray Redesign Plan | Tom Borden | SLAC | November 14, 2002 |
(pdf) |
ASIC Review | Robert Johnson | SLAC | December 6, 2002 | |
Tracker CDR Presentation | Robert Johnson | SLAC | May 14, 2003 |
(ppt) |
Honeycomb Grounding Scheme | Sandro Brez | SLAC | May 15, 2003 |
(ppt) |
Tracker Design Revisions | Robert Johnson | SLAC | May 20, 2003 |
(ppt) |
First bottom tray static test results | Erik Swensen | Hytec | July 23, 2003 | |
Split tungsten foil analysis | Erik Swensen | Hytec | September 9, 2003 |
(pdf) |
Tracker overview at collab. mtg | Robert Johnson | Rome | September 11, 2003 | |
Cutting of thick tungsten foils | Sandro Brez | Pisa | September 2003 | |
Offline analysis of Mini-Tower data | Ronaldo Bellazzini | Pisa | October 6, 2003 | |
GTRC Timing & TOT Problems | Robert Johnson | UCSC | October 23, 2003 | |
GTRC Mini Review | Robert Johnson | UCSC | November 14, 2003 | |
Tracker Alignment Meeting | Mike Menning | SLAC | March 22, 2004 | |
GLAST Large Area Telescope | Robert Johnson | IEEE, Portland | October 2003 | |
Tracker-Tracker Clearance | Mike Menning | SLAC | May 2004 | |
Cone adjustment tools | Peter Amnuaypayoat | SLAC | April 29, 2004 | |
Eccentric cone adjustment methods | Peter Amnuaypayoat | SLAC | May 14, 2004 | |
TKR Detector and FE Electronics | Mutsumi Sugizaki | SLAC | June 8, 2004 | |
Large charge injection into the GTFE with SSDs attached | Mutsumi Sugizaki | UCSC | July 27, 2004 | |
Tracker installation review | Peter Amnuaypayoat | SLAC | August 2004 | (ppt) |
Tray panel W and Kapton bonding MRR | Sandro Brez | Pisa | October 1, 2004 | |
MRB on the encapsulation debonding issue | Sandro Brez | Pisa | October 6, 2004 | (ppt) |
MRB on the MCM connector interference issue | Sandr Brez | Pisa | October 6, 2004 | (ppt) |
MRR for the GSFC tile etching and priming | Ben Rodini | Swales | October 12, 2004 | (pdf) |
Tracker test temperatures | Jack Goodman | SLAC | October 13, 2004 | (pdf) |
TKR Clock Duty Cycle, MRB for NCR 107 | Robert Johnson | UCSC | October 15, 2004 | (ppt) |
Pitch-adapter test fixture | Peter Amnuaypayoat | SLAC | October 15, 2004 | (ppt) |
Bias circuit bonding bubbles, MRB | Sandro Brez | Pisa | November 8, 2004 | (ppt) |
MCM disconnected channel MRB | Robert Johnson | UCSC | November 9, 2004 | (ppt) |
Tower T/V MGSE issues | Nicola Saggini | INFN Pisa | November 11, 2004 | (ppt) |
MRB on bubbles in Kapton gluing | Luca Latronico | Pisa | November 12, 2004 | (ppt) |
Second MRB on the encapsulation debonding issue | Robert Johnson | UCSC | November 17, 2004 | (ppt) |
MRR for G&A Production | Luca Latronico | Pisa | November 18, 2004 | (ppt) |
MRB on broken ladder wire bonds | Luca Latronico | Pisa | December 3, 2004 | (ppt) |
Conformal coating on connector interface | Richard Gobin | SLAC | December 4, 2004 | (pdf) |
Tracker Tower A Thermal-vac TRR. |
Jack Goodman | SLAC | December 7, 2004 | (pdf) |
Tracker Tower A Dynamic Test Readiness | Mike Opie, Eric Roulo | SLAC | December 7, 2004 | (pdf) |
MRB 241/248 | Dave Nelson | SLAC | January 4, 2005 | (pdf) |
Pitch-Adapter Issues Review; new fixture | Robert Johnson | UCSC | January 20, 2005 | (pdf) |
Pitch-Adapter Issues Review; plan forward | Robert Johnson | UCSC | January 20, 2005 | (ppt) |
Description of PA problem | Charlie Young | SLAC | January 20, 2005 | (ppt) |
LAT Pitch Adapter Data | Bill Craig | SLAC | January 20, 2005 | (ppt) |
Pitch Adapter Plating Thickness | Richard Gobin | SLAC | January 20, 2005 | (ppt) |
MRB on MCM PWB short circuits | Tom Himel | SLAC | February 4, 2005 | (pdf) |
MRB on SLAC Flex Cables for Tower 4 | Dave Rich | SLAC | March 24, 2005 | (ppt) |
Owner: Robert Johnson
Last Modified: 03/24/2005 07:31 AM