LAT Tracker Presentations

(Not Comprehensive)

Subject Author Where When Files
GLAST LAT Project Overview Robert Johnson Elba SpacePart May 18, 2002

(pdf)

LAT Tracker Construction in Italy Ronaldo Bellazzini Elba SpacePart May 18, 2002

(pdf)

Briefing on Prototype Tower Testing Robert Johnson SLAC June 19, 2002

 (pdf)

Proto Tower Vibe Test Results and FEA Erik Swensen SLAC June 19, 2002

(pdf)

GLAST LAT Silicon-Strip Tracker Robert Johnson SPIE, Seattle July 9, 2002

(ppt)

Delta-PDR Tracker Presentation Robert Johnson SLAC July 30, 2002

(ppt)

Tracker EM plan Robert Johnson SLAC October 14, 2002

(ppt)

Quarterly Review Presentation Robert Johnson SLAC November 12, 2002

(pdf)

(ppt)

Bottom Tray Redesign Plan Tom Borden SLAC November 14, 2002

(pdf)

ASIC Review Robert Johnson SLAC December 6, 2002

 (pdf)

Tracker CDR Presentation Robert Johnson SLAC May 14, 2003

(ppt)

Honeycomb Grounding Scheme Sandro Brez SLAC May 15, 2003

(ppt)

Tracker Design Revisions Robert Johnson SLAC May 20, 2003

(ppt)

First bottom tray static test results Erik Swensen Hytec July 23, 2003

(ppt)

Split tungsten foil analysis Erik Swensen Hytec September 9, 2003

(pdf)

Tracker overview at collab. mtg Robert Johnson Rome September 11, 2003

(pdf)

Cutting of thick tungsten foils Sandro Brez Pisa September 2003

(ppt)

Offline analysis of Mini-Tower data Ronaldo Bellazzini Pisa October 6, 2003

(ppt)

GTRC Timing & TOT Problems Robert Johnson UCSC October 23, 2003

(pdf)

GTRC Mini Review Robert Johnson UCSC November 14, 2003

(ppt)

Tracker Alignment Meeting Mike Menning SLAC March 22, 2004

(pdf)

GLAST Large Area Telescope Robert Johnson IEEE, Portland October 2003

(ppt)

Tracker-Tracker Clearance Mike Menning SLAC May 2004

(ppt)

Cone adjustment tools Peter Amnuaypayoat SLAC April 29, 2004

(ppt)

Eccentric cone adjustment methods Peter Amnuaypayoat SLAC May 14, 2004

(ppt)

TKR Detector and FE Electronics Mutsumi Sugizaki SLAC June 8, 2004

(pdf)

Large charge injection into the GTFE with SSDs attached Mutsumi Sugizaki UCSC July 27, 2004

 (html)

Tracker installation review Peter Amnuaypayoat SLAC August 2004  (ppt)
Tray panel W and Kapton bonding MRR Sandro Brez Pisa October 1, 2004

(ppt)

MRB on the encapsulation debonding issue Sandro Brez Pisa October 6, 2004 (ppt)
MRB on the MCM connector interference issue Sandr Brez Pisa October 6, 2004 (ppt)
MRR for the GSFC tile etching and priming Ben Rodini Swales October 12, 2004 (pdf)
Tracker test temperatures Jack Goodman SLAC October 13, 2004 (pdf)
TKR Clock Duty Cycle, MRB for NCR 107 Robert Johnson UCSC October 15, 2004 (ppt)
Pitch-adapter test fixture Peter Amnuaypayoat SLAC October 15, 2004 (ppt)
Bias circuit bonding bubbles, MRB Sandro Brez Pisa November 8, 2004 (ppt)
MCM disconnected channel MRB Robert Johnson UCSC November 9, 2004 (ppt)
Tower T/V MGSE issues Nicola Saggini INFN Pisa November 11, 2004 (ppt)
MRB on bubbles in Kapton gluing Luca Latronico Pisa November 12, 2004 (ppt)
Second MRB on the encapsulation debonding issue Robert Johnson UCSC November 17, 2004 (ppt)
MRR for G&A Production Luca Latronico Pisa November 18, 2004 (ppt)
MRB on broken ladder wire bonds Luca Latronico Pisa December 3, 2004 (ppt)
Conformal coating on connector interface Richard Gobin SLAC December 4, 2004 (pdf)
Tracker Tower A Thermal-vac TRR.
 
Jack Goodman SLAC December 7, 2004 (pdf)
Tracker Tower A Dynamic Test Readiness Mike Opie, Eric Roulo SLAC December 7, 2004 (pdf)
MRB 241/248 Dave Nelson SLAC January 4, 2005 (pdf)
Pitch-Adapter Issues Review; new fixture Robert Johnson UCSC January 20, 2005 (pdf)
Pitch-Adapter Issues Review; plan forward Robert Johnson UCSC January 20, 2005 (ppt)
Description of PA problem Charlie Young SLAC January 20, 2005 (ppt)
LAT Pitch Adapter Data Bill Craig SLAC January 20, 2005 (ppt)
Pitch Adapter Plating Thickness Richard Gobin SLAC January 20, 2005 (ppt)
MRB on MCM PWB short circuits Tom Himel SLAC February 4, 2005 (pdf)
MRB on SLAC Flex Cables for Tower 4 Dave Rich SLAC March 24, 2005 (ppt)

Owner: Robert Johnson

Last Modified: 03/24/2005 07:31 AM