TMCM Production Readiness Review

10 FEB 04 @ Teledyne

 

 

Time

Duration

min.

Topic

Presented by

8:00

10

Team Introductions

All

8:10

20

Opening comments, Design Overview

Robert Johnson

8:30

15

TMCM Integration & Wire Bonding at G&A Engineering (Italy)

Robert Johnson

8:45

30

Lessons Learned with the Mini-Tower Prototypes and Corrections Implemented

Robert Johnson

9:15

15

Design Status: Drawings and Documentation

Robert Johnson

9:30

30

Break

 

10:00

30

Parts and Materials Status, Parts Screening and Inspections, Traceability

David Rich

10:30

10

Summary of the QA Review of Teledyne and its Outcome

David Rich

10:40

30

TMCM Production Flow, Including Inspection Points and Standard Rework Procedures

Brian Caplen

11:10

30

Production Lessons Learned and Process Improvements Incorporated

Brian Caplen

11:40

20

Tooling and Fixture Status

Brian Caplen

12:00

60

Lunch

 

1:00

15

TMCM and ASIC Electrical Screening and Test Procedures

Robert Johnson

1:15

10

TMCM Environmental Acceptance Testing and Burn-In Procedures

Robert Johnson

1:25

10

TMCM and ASIC Qualification Plan and Procedures

Robert Johnson

1:25

15

LAT On-Site Presence and Mandatory Inspection Points

David Rich

1:40

15

Preproduction Status and Results

David Rich

1:55

15

NCR Summary for Preproduction; Lessons Learned and Improvements Incorporated

David Rich

2:10

10

Flight Production Plan and Schedule

David Rich

2:20

10

Purchase Order Status

Rhonda Santiago

2:30

60

General Discussions and Closing

All

3:30

 

Meeting Adjourn