|
Document Tree ![]() click for larger view |
ISOC Documents:
| MD - Management Document | |||
| Doc No | Rev | Author | Title |
| MD-02513 | 11/04/04 | L. Bator B. Lee L. Steele |
LAT ISOC Verification and Validation Plan |
| MD-04443 | 7/08/04 | R. Cameron D. Lung | ISOC Management and development plan |
| MD-05150 | draft | L. Bator S. Culp B. Lee |
ISOC Test plan |
| MD-04835 | draft | L. Bator L. Steele |
ISOC configuration Management Plan |
| SS - System Specification (Requirements) | ||||
| Word/PDF | HTML | Rev | Author | Title |
| SS-00015 | SS-00015 | 09/15/04 | L. Bator | LAT IOC PERFORMANCE SPECIFICATION - LEVEL II(B) (new version is out for signoff) |
| SS-00021 | SS-00021 | 01/06/05 | L. Bator, W. Craig, S. Digel, D. Lung, J. Martin |
LAT INSTRUMENT OPERATIONS FACILITY SUBSYSTEM SPECIFICATION - LEVEL III |
| SS-00020 | SS-00020 | 01/07/02 | R. Dubois | LAT SCIENCE ANALYSIS SOFTWARE REQUIREMENTS DOCUMENT - LEVEL III |
| SS-01378 | N/A | 07/14/04 | L. Bator, W. Craig, S. Digel, D. Lung, J. Martin |
LAT OPERATIONS PLAN |
| SS-01783 | N/A | draft | D. Lung | LAT OPERATIONS FACILITY LEVEL 4 SPECIFICATION |
| SS-05141 | N/A | draft | M. Arndt L. Steele |
GLAST FSW-ISOC INTERFACE CONTROL DOCUMENT |
| PR - Visual/Presentation | ||||
| Doc No | Rev | Author | Title | |
| PR-00515 | 1/16/2002 | multiple | LAT IOC PRE-PDR PEER REVIEW PRESENTATION - 8/17/01 | |
| PR-00848 | 8/14/2002 | multiple | INSTRUMENT OPERATION CENTER (PDR Presentation) | |
| PR-03213 | multiple | LAT ISOC PRE-CDR PEER REVIEW PRESENTATION - 3/2/04 | ||
| TD - Technical Document | ||||
| Doc No | Rev | Author | Title | |
| TD-00428 | 12/21/2001 | S.Williams | LAT INSTRUMENT OPERATIONS CENTER PRELIMINARY DESIGN REPORT | |
| TD-02659 | automatic update daily | multiple | TELECOMMAND AND TELEMETRY FORMAT | |
| TD-04778 | draft | S.Culp L. Steele |
ISOC SOFTWARE ARCHITECTURE DESCRIPTION | |
Planned ISOC Documents:
| Title | Author(s) | ECD |
| ISOC CCB Process | TBD | |
| Change Request Procedures | TBD | |
| FSW User Guide | M. Arndt | |
| FSW and Testbed Maintenance Plan | TBD | |
| Instrument Operations Handbook | L. Bator, M. Arndt | |
| LAT Mission Planning Procedures | L. Bator | |
| On-orbit Operations Procedures | L. Bator | |
| Launch and Early Orbit Operations | TBD | |
| ISOC Team Coordination | TBD | |
| ISOC Calibration Procedures | TBD | |
| Operator's Handbook | TBD | |
| Pipeline and Data Handling | TBD | |
| Pipeline Operations Procedures | TBD | |
| SAS Tools User Guide | TBD |
Other Relevant LAT Documents:
| MD - Management Document | ||
| MD-00054 | 1/6/2003 | LAT PROJECT MANAGEMENT PLAN |
| MD-00068 | 1/22/2001 | LAT CONFIGURATION MANAGEMENT PLAN |
| MD-00104 | 7/24/2003 | LAT FLIGHT SOFTWARE MANAGEMENT PLAN |
| MD-00360 | 9/7/2001 | LAT SCIENCE ANALYSIS SOFTWARE MANAGEMENT PLAN |
| MD-00446 | 3/26/2003 | LAT Science Verification and Calibration Plan |
| PS - Process Specification | ||
| SS - System Specification | ||
| SS-00020 | 1/7/2002 | LAT SCIENCE ANALYSIS SOFTWARE REQUIREMENTS DOCUMENT |
| SS-00456 | 12/4/2001 | LAT I&T ONLINE REQUIREMENTS DOCUMENT - LEVEL 3 |
| SS-00505 | 12/17/2001 | SAS LEVEL 4 REQUIREMENTS |
| TD - Technical Document | ||
| TD-00227 | 9/18/2003 | LAT THERMAL OPERATIONS ASSUMPTIONS |
| TD-00500 | 12/14/2001 | EGSE CONCEPT FOR LAT |
| TD-00501 | 12/14/2001 | LAT MISSION PHASES |
| TD-00540 | 1/23/2002 | LAT OPERATION MODES IN ORBIT |
| TD-00541 | 1/23/2002 | INFORMATION TO BE BROUGHT DOWN FOR CALIBRATION, MONITORING, AND LOG KEEPING |
| TD-02905 | 1/22/2004 | LAT Housekeeping |
| TD-04631 | 9/27/04 | LAT INTEGRATION AND TEST INSTRUMENT DATA ANALYSIS PRIMER |
Ground System or Element-level Documents:
For LAT reviewers of MOC documents, go here
Ground System Master Controlled Documents List (password protected - contact Shirley Gasch for access)