The planned kickoff date for DC1 is mid September 2003 -
the collaboration meeting in Rome.
In order to get there, we need/want the following:
- Gleam
- validate subsystem geometry
- perform validations as deemed necessary
- decide on what is needed for further G4 validation
and do it
- upgrade System Tests for better diagnostics
- include the FSW onboard filter into Gleam
- implement fluxes to create one day's data in orbit
- arrive at understanding on how to handle exposure
- complete background rejection analysis
- include Classification Tree, and mechanism to use
Insightful Miner output
- complete performance evaluation and parameterization
- make sure it is possible to enable failure modes in
all subsystems
- add event classification algorithm and output
- define and implement final analysis ntuple ("Level 1
database")
- create an analysis platform for the event-based
analysis
- Processing Pipeline & related tools
- be able to generate the DC data via the pipeline and
populate the database
- create web interface to show available data
- create tools to prune and concatenate the output
datasets
- Science Tools readiness
- decide which tools will be applied to this challenge
- implement access to L1 Gleam output
- Documentation and Tutorial
- document TDS & Root output classes
- document installation and use of analysis platform
- document installation and use of Gleam
- prepare sample analysis
- prepare user tutorial for the collaboration meeting