Present: Joanne Bogart, Toby Burnett, Jim Chiang Richard Dubois, Zach Fewtrell, Riccardo Giannitrapani, Tom Glanzman, Navid Golpayegani, Michael Kuss, Matt Langston, Julie McEnery, Chuck Patterson, Igor Pavlin, James Peachey, Leon Rochester, Tracy Usher
Compared with previous, output for all-gamma shows some problems with CAL axis determination. Zach, at SLAC this week, will be investigating.
Changes to CAL likelihood code caused a significant slow-down for these runs; since then it has been fixed. CAL moments analysis may need some work. (Richard) Raised noise level and changed threshold from 1.3 to 2.0. Tracy saw what should have been a 0.1 Mev hit show up as 40 Mev. [Late-breaking news: Zach has found and fixed the problem; Tracy has verified it's ok.]
Toby has generated 5 million gammas and some background events at Seattle with a HEAD build. Although the gammas have the above problems, they are adequate for Toby's purposes.
(Richard) Pruner, peeler, data server all seem fine. Pruning of background runs was taking about an hour [not really an hour, but an hour in the unit SLAC uses, tied to execution speed on no-longer-used hardware], at the limit of the queue, so Igor has raised the limit.