SAS-SVAC "Dry run" - 9 Dec 2004

EM package

released: v3r0407p1 

new calibGenCal still promised 12/22. From Mark & Zach:

  • Holding to 12/22 for most of new calibGenCal

  • Not yet for multiple towers

  • Demonstration of current capability:  David has run FM data through calibGenCAL v2r5 and matching recon;  results look reasonable

  • Other open issues: 

    •  DAC values from CI intlin tests:  into LDF/UDF and hence digiroot

    • Serial numbers

ToT: from Leon

Root4: still being worked on. Breakthrough not yet scheduled

New TkrRecon: will need to evaluate G4 6.2.2 as well as new recon. No promises, but maybe late January.

FRED

0.93 working fine. Riccardo will look at putting in "Back" button on branch of code.

Systests

done - no problems detected.

http://www-glast.slac.stanford.edu/software/SysTests/TestInfo.asp

and select v3r0407p1 for EngineeringModel.

Pipeline:

running

LDF Validator: Steve Culp

being scoped out. No schedule yet, but soon. Maybe easier to create if LDF is considered a validation of FSW.  We can use the Online LDF iterators to parse the file and insert checks on the data as deemed appropriate.  This will ease the burden of development and will bring a prototype into existence much quicker.
.

CCB Process

scoped out - waiting for right time to initiate

http://confluence.slac.stanford.edu/display/FLTINTSWCCB/Home


R.Dubois Last Modified: 2004-12-10 07:44:02 -0800