GLAST Large Area Telescope (LAT)

Integration and Test (I&T)

Mechanical Ground Support Equipment (MGSE)

Department

 

Development of tooling, hardware integration processes, associated support stands and test fixtures to help LAT get to orbit.

 


LAT MGSE Stress Analysis Report, Preliminary

LAT MGSE Photos

GPR to Proof Test Weight Stack ( 3 of 4 Clevis Pins )

PAP Support Column on BSA

End of 2004 Accomplishments

T-VAC Configuration, Dec. 08, 2004

LAT MGSE IRSR, Rev. Nov. 16, 2004

NRL Environmental Tests - Mech Ops

Photos 2004-09-23 on the I&T Photo page

MGSE DXF Files

Acoustic Test Configuration Models

Integration Stand Schedule

GPR and GPR to Grid Drawings

T/V Ops TIM

PAP Clarification Summary

PAP Clarification, Entire


MGSE Status Matrix, Near Term

    May 20, 2004 Status

    May 11, 2004 Status:

    April 15, 2004 Status


 

MGSE Design/Status Review - Integration Items

Date/Time:  February 24th, 2004 @ 1:00PM - 3:00PM

Location: SLAC Building 28 Conference Room

Presentation:   [pdf]

Stress Analysis Summary: [pdf]

Support Stand Indentured Drawing List: [pdf]


 

MGSE Review

Date/Time:  February 5th, 2004 @ 10:30AM - 12:00PM

Location: SLAC Building 28 Conference Room

Call-in Information:  510-665-5437  Meeting ID: 7520

Meeting Charge:

Presentation:   [pdf]

Backup Slides:  [pdf]

 


MGSE Development Plan

E-Box / Menning Plate Fit Check

Mylar TKR Cable Fit Check, Dec. 03

Engineering Model Processing Concepts


Team Members:

                  - MGSE Dept. Manager

Eric Roulo - Dynamic Analysis

Bill Olson - Design - Analysis Review & Oversight Support

Steve Score - Design

Patrick Williams - Design

Wing Ng - Design