Document # |
Date Effective |
|
|
LAT-TD-07328 |
|
|
|
Prepared by(s) |
Supersedes |
|
|
L. Latronico |
|
|
|
GLAST LAT Technical
Note |
H. Tajima R. P. Johnson |
|
|
Subsystem/Office |
||
|
Tracker Subsystem |
||
|
Document Title |
||
Gamma-ray Large Area Space Telescope (GLAST)
Large Area Telescope (LAT)
Tracker Subsystem
End Item Data Package
Tower 9
DOCUMENT APPROVAL
|
Prepared
by: |
|
|
|
|
|
|
|
L. Latronico |
|
Date |
|
Approved by: |
|
|
|
|
|
|
|
E. Rapposelli |
|
Date |
|
|
|
|
|
L. Latronico |
|
Date |
|
|
|
|
|
N. Mazziotta TKR Subsystem Environmental Test Lead Engineer |
|
Date |
|
|
|
|
|
A. Troianiello |
|
Date |
|
|
|
|
|
Robert P. Johnson |
|
Date |
|
|
|
|
|
A. Brez |
|
Date |
LAT Acceptance
|
|
|
|
|
Dick Horn |
|
Date |
|
|
|
|
|
Pat Hascall |
|
Date |
|
|
|
|
|
Elliott Bloom |
|
Date |
|
|
|
|
|
Darren Marsh |
|
Date |
|
|
|
|
|
Other |
|
Date |
CHANGE HISTORY LOG
|
Revision |
Effective Date |
Description of Changes |
|
01 |
|
Initial Draft |
|
02 |
|
Updates with SLAC test results |
|
|
|
|
|
|
|
|
|
|
|
|
The purpose of this document is to collect all the data for the Glast LAT Tracker (TKR) Tower End Item Data Package (EIDP), in compliance with LAT-TD-04350 and PRC_Pi_QC_005. This document is compiled and reviewed within the Tracker subsystem prior to shipment of Tower A from INFN to SLAC. The contents of this document have been coordinated between LAT Integration, Test, and Calibration (IT&C), LAT Systems Engineering (SE), LAT Quality Assurance (QA), and the TKR subsystem.
|
Item Description: |
||
|
Identification |
Part/Drawing
Number |
Serial
Number |
|
|
LAT-DS-00722 |
9 |
|
Cable holding plate |
LAT-DS-03826 |
NA |
|
LAT-DS-03949 |
NA |
|
|
MECHANICAL SUMMARY DATA |
Mechanical Lead: E.
Rapposelli |
|
|
|
ITEM: |
REMARKS: |
|
|
Structural
Analysis reviewed and acceptable |
Available on file
at SLAC |
|
|
Structural
Tests reviewed and acceptable |
Available on
file at SLAC |
|
|
Open Items from tests
performed or from meetings with SLAC |
None |
|
|
Mass (measured) |
32.744 Kg |
|
|
Mass / Center of Mass
Report - Analysis |
Mass / CoM
report |
|
|
Dimensions |
Complies with IDD |
|
|
Interface flatness and
surface finish |
Complies with IDD |
|
|
Dimension Inspection
Report |
|
|
|
Final visual inspection
prior to shipping |
Tower Flow-chart on file
at INFN-Pisa (summary) |
|
ELECTRICAL SUMMARY DATA |
Luca Latronico |
Electrical Lead: Hiro Tajima |
|
|
|
DESCRIPTION: |
REMARKS: |
REMARKS: |
|
|
Power consumption (28V, 25
deg C, nominal activity) TKR + TEM/TPS |
18.48 W |
|
|
|
Power consumption (AVVDA, AVDDB,
DVDD, 25 C, nominal Activity) |
10.04 W |
10.37 W (21.3 deg C) |
|
|
Overall leakage current at
100V |
66.5 μA |
90.2 μA (21.3 deg C) |
|
|
Part List reviewed and
acceptable |
Tower Flow-chart on file
at INFN-Pisa |
N/A |
|
|
Pre-ship electrical Test
reviewed and acceptable |
Available on file at
INFN-Pisa |
N/A (See below for post-shipping and hand-off test results.) |
|
|
Open Items from previous reviews
/ meetings / tests |
Status of channels history (link) |
Status of channels history (link) |
|
|
Relevant support documents |
Standard schema (xml archive) Tower Map (link) |
Standrad schema files (xml
archive) |
|
PRODUCT ASSURANCE DATA |
Quality Lead Engineer: Aldo Troianiello |
|
|
|
DESCRIPTION: |
REMARKS: |
|
|
Non-conformance report
summary |
NCR summary (link) |
|
|
Open NCRs / RFW / RFD |
NA |
|
|
Traceability of unit
pedigree |
Tower Flow-chart on file
at INFN-Pisa |
|
|
Photographic Record |
On file at INFN-Pisa (link) |
|
|
Inspection records |
Tower Flow-chart on file
at INFN-Pisa |
|
|
Storage, handling, shock
records |
|