Agenda & Minutes [see old agendas here]
To go to CAL software weekly reports page, click
here
-
Tues, Sept 20, 2005 (GCR Calib) (Notes)
- Review of Status
- On-orbit Calibration Plan (Mark)
- GCR Framework (Mark)
- Heavy ion rates (Andrey)
- MIP finding/reaction filtering (Fred)
- GSI paper (Benoit)
- Heavy ion peak shape models (Eric, Benoit)
- Other business
-
Tues, July 26, 2005 (GCR Calib)
- Review and status of tasks (pdf)
- Comparison of CREME96 and CRHeavyIonPrimary rates (corrected from previous
presentation;
Andrey)
-
Tues, June 21, 2005 (GCR Calib)
- GCR Rates form CREME96 and CRHeavyIonPrimary (Andrey)
- Actions:
- Check on angular coverage/solid
angle normalization of GLEAM
CRs
- Check on simulated date for GLEAM
simulations
- Short meeting at DC2 workshop
- Meet during
EUD
Colloquium, Tues afternoon at 3:30pm
- Next vrvs meeting 12 July
-
Wed, May 18, 2005 [Revision Group]
- Algorithm/Tool Structure
- Implementation plan
- Sasha Chekhtman - Cal Trigger Information in TDS
- Tues, May 17, 2005 [GCR Calib]
- Task List Review (pdf)
- Action Item Review
- Produce revised task list for next mtg (Mark)
DONE
- Check fluxes generated by CRHeavyIonPrimary (Andrey)
- Implement quenching model in simulation (G4Generator or Digi?) (Sasha)
- Verify and investigate excessive compute time for heavy ion simulation in
G4. Delta e- in MC file? (Andrey + ?))
- Resolve excessive TKR recon time for heavy ions; email Tracy (Mark + TKR
guys) IN PROGRESS
- Wed, May 11, 2005
- Wed, May 4, 2005 [Revision Group]
- Wed, April 20, 2005
- Sasha Chekhtman - external position estimation Postponed to next week
- Zach Fewtrell - Proposed extensions to CalXtalRecData
Postponed to next week
- MIP finder update (from Fred via email)
- The Gaudi tool code is now almost de-bugged
- Next tasks:
- the update of its outputs (track candidates) to the TDS
- the modifications of the HepRep service to add these outputs to the FRED
event display in a view of better understanding the algorithm behaviour and of
scanning easily larger sets of events
- Other Status Reports
- Wed, April 13, 2005 [Revision again]
- David Chamont: CalRecon architecture (see confluence link
here)
- Wed, April 6, 2005 [CALRecon Revision Group]
- Bill Atwood: Cal Assessment and Proposal (ppt,
pdf)
- Tracy Usher: Updated TDS Diagram (ppt,
pdf
- Example prototype of CalEventSummary
here
- Example prototype of CalCorToolResult
here
- Wed, March 23, 2005 [CALRecon Rewrite Meeting]
-
Tracy
- Proposed new TDS entries from calXtalResponse (Zach)
- Wed, March 9, 2005 SLAC Meeting
- Wed, February 23, 2005
- DC2 requirements and nearterm agenda
- Face to face meeting discussion
- NRL
- FLE/FHE thold (Sasha)
- CalXtalResponse status
- LLR
- Low energy reconstruction (Pol)
- CENBG
- Proton inelastic xsec (Johan)
- GAM
- SLAC
- Wed, February 9, 2005
- rdb database news (David)
- CalXtalResponse issues
- Energy storage -- Bill still wants end energies; Store energies or
asymmetry?
- Coping with 4-range modes: what do we do with ranges other than
"best"? How do we deal with ranges in the noise?
- Coping with mixed range modes on ends
- Implementation of Bill's LAC/2 cut
- Detection and handling of "near end" events
- Recon update, schedule
- Structural upgrade
- MIP finder
- Clustering
- Improved algorithms
- GSI proton analysis update (Johan)
- Wed, January 26, 2005
- NRL
- Mark -- Testing support
- Zach -- Testing CAL response tools (still finishing digi)
-
Sasha -- Reviewing test data, revamping INTNONLIN procedures
- Andrey -- Studying CAL/TKR alignment
- LLR (Philippe)
- CENBG (Benoit,
Johan)
- GAM (Eric)
- SLAC
- Wed, January 12, 2005
- NRL
- Mark -- Finished calibGenCAL v3 doc
- Zach -- Working on testing CAL response tools
- Sasha -- Data review, working on ciFit mods
- Andrey -- Studying CAL/TKR alignment methods
- LLR (Berrie,
David)
- CENBG (Benoit,
Johan)
- GAM
- MIP-finder progress (Fred)
- SLAC
- Wed, December 15, 2004
- NRL (sasha
1,
2)
- LLR (Philippe)
- CENBG
- GAM
- SLAC/I&T
- Wed, December 1, 2004 (I&T Query Meeting)
- Wed, November 24, 2004
- Hardware Status
- NRL
- LLR
- CENBG
- GAM
- SLAC/I&T
-
Update from David on CAL I&T activities
- What next? Upcoming software tasks
- calibGenCAL v3 (NRL)
- ced file header into LDF, root (NRL, SLAC, Heather)
- CalCalibSvc, Cal Response Tools rewrite (NRL)
- CalRecon restructuring, rewrite; incorporation of calvalstool
functionality into CALRecon (SLAC, UCSC, LLR, NRL)
- CalRecon algorithm improvements (Last Layer, Profile Fitting) (LLR)
- MIP finding (GAM, SLAC, UCSC)
- Clustering (SLAC)
- TKR/CAL alignment studies (?)
- Incorporation of TKR into CALRecon, GCR calib i.e. development of TKR
track extrapolation with uncert, alignment (GAM, CENBG, NRL, SLAC)
- Recon "decision tree" (NRL, LLR, UCSC)
- GCR calibration (CENBG, GAM, NRL)
- Heavy ion simulation (CENBG)
- Filter development (CENBG, GAM)
- Calibration algorithms development (GAM, CENBG)
- Software framework (NRL)
- Systematic uncertainty studies (NRL, LLR)
- Wed, November 10, 2004
- Hardware Status
- NRL (sasha1,
sasha2,
sasha3)
- LLR
- CENBG
- Comparing measured and simulated nuclear interaction data (Johan)
- GAM
- Fred and Silvain are hard at work at NRL analyzing flight hardware test
data
- SLAC/UCSC
- Wed, October 27, 2004
- Hardware Status
- FM 102,103 in TV
- FM 104 in final assembly
- Preship review for FM 101 soon
- Fred and company to arrive soon. Get some sleep while you can!
- Calibration Work
- Will release calibGenCAL v2r5 tomorrow
- v2r5 is a small mod to v2r4 ("Old" style calibration)
- No CI calibrations inlcuded -- muon only
- Will go into preship review for FM101 with calibration package, document
based on v2r5
- "New" style calibration work will be done ~22 Dec
- All towers shipped with v2r5 packages will be reanalyzed with v3
- Reanalysis should be done before or about same time that first TKRs arrive
- Recon rewrite
- Delays due to SLAC stand-down will delay CALrecon rewrite by a week or two
- Richard: Tracy will be ready to start talking 1st or 2nd wk of Nov.
- David C. will come to SLAC for a week.
- Still want meeting in first half of December? Yes but not sure when.
Maybe wk of 13 Dec (conflicts with Texas Symp. -- problem?)
- LLR
- Philippe Bruel has installed s/w, started working on recon
- Pol is running gamma batches at Lyon. Currently 20 nodes and
growing. Looking at new variables to expand range of last layer.
- CENBG
- Status report from David (ppt
pdf)
- GAM
- Status report from Frederic (pdf)
- SLAC/UCSC
- Friday, October 1, 2004
- CAL software meeting at SLAC
- Wed, September 22, 2004
- Status of I&T Work
- Final allocation of speaking time at I&T Meeting
- Overview of New Recon, Digi, Calib (10min -- Mark)
- Cross-talk Issues (FLE and "Retrigger") (10min -- Sasha)
- Various topics (?) (20min -- Benoit)
- Direct Diode Deposit (10min -- Traudl)
- Light Behavior Near Xtal Ends (10min -- Andrey proxy)
- LLR
- CENBG (Benoit)
- GAM
- UCSC
- SLAC/UW
- MIP study (David)
- Recon issues (Toby)
- CalValsTool migration to CALrecon
- LAC threshold (1 MeV or 2 MeV?)
- CAL s/w meeting agenda
- I&T/flight h/w Status
- DC2 Requirements
- Discussion of muon simulation
- Recon futures
- GSI results
- GCR calibration futures
- Wed, September 8, 2004
- Status of I&T work
- Speaking assignments for I&T Meeting
- Agenda for CAL s/w meeting
-
LLR
-
CENBG
-
GAM
- UCSC
- SLAC
- Wed, August 25, 2004
-
Status of I&T work (Mark/Sasha)
- LLR
-
CENBG/GAM
- UCSC
- SLAC
- Agenda for CAL s/w face-to-face meeting
- Wed, August 4, 2004
- Report on muon threshold problems (Sasha)
- I&T schedule
update (Mark)
- CAL geometry
update (Mark)
- Light attenuation
update (Andrey)
- LLR
- CENBG/GAM
- UCSC
- SLAC
- Wed, July 21, 2004
- Report on profile
fitting (Pol/Berrie)
- Report on CalRspSvc desgin (Zach)
-
List
of I&T/calibration issues (Mark)
- CENBG/GAM
- UCSC
- SLAC
- Wed, June 16, 2004
- Light attenuation status
- Geometry document status
- LLR
- CENBG
- GAM
- UCSC
- SLAC
- Wed, May 19, 2004
- Status of calibration algorithms (Sasha)
- Status of task list
- LLR
- CENBG (Benoit)
- GAM
- SLAC
- Wed, May 5, 2004 (see notes
here)
- Status of problems in GSI analysis (Benoit, Frederic, Mark)
- "antiquenching"
- zero-suppress/autorange data
- Clustering and Low-energy recon tasks
- Next face to face mtg -- when?
- NRL
- LLR
- CENBG
- GAM
- Fri, April 23, 2004
- Discussion of proposed CAL s/w
organization
- Weekly reports, please
- Other?
- Thurs, Friday, April 15-16, 2004
- CAL software meeting at NRL: see current agenda
here
- Fri, Mar 26, 2004
- Muon calibration study --
Sasha
- Heavy ion simulation results --
Benoit
- Discussion of April meeting
agenda
- I&T support status --
Mark,
Eduardo/Xin
- Fri, Mar 12, 2004
- Discussion of I&T and other calibration requirements. See
notes.
- Fri, Mar 5, 2004
- Fri, Feb 20, 2004
- Review Julie's
Plots
- CALRecon tag promotion for v4r1?
- NRL --
Sasha
- LLR -- Pol
- Bordeaux -- Benoit, Thierry
- GAM -- Frederic
- SLAC -- Xin
- Meeting in April?
- Fri, Feb 6, 2004
- NRL -- Sasha
- LLR -- Berrie, Pol
- Bordeaux -- Benoit
- Montpelier -- Frederic
- SLAC -- Xin
- Fri, Jan 23, 2004
- correction for events with direct energy deposition in diodes (Berrie)
- simulation of pedestals in the EM (Pol)
Fri, Nov 7, 2003
- EM CAL analysis at NRL (Sasha)
- EM CAL analysis at SLAC (Xin)
- EM CAL analysis at LLR (Pol)
- CAL failure mode analysis status (Andrei)
- CAL s/w meeting?
- Fri, Oct. 10, 2003
- EM CAL
results
(Sasha)
- Failure mode analysis (Andrey)
- CAL recon (Berrie)
- GSI/CERN (Benoit)
- Quenching effects (Johan)
- Fri, Sept. 5, 2003
- New EM CAL results (Sasha)
- Geometry Verification (Andrey)
- Recon update (Berrie)
- CERN beam test result update
fig 1 and
fig 2 (Benoit)
- JQMD/G4 heavy ion update (Thierry)
- CAL S/W Meeting at SLAC, 12-13 August 2003
- Eric's CAL hardware update
-
Sasha's
E/M calibration analysis update
- Eduardo's
E/M testing at SLAC update
- Berrie's
CAL recon talk
-
Fri, July 25,2003
- NRL update (Sasha)
- LLR update (Berrie)
- Bordeaux update (Benoit)
- Plans for next CAL s/w face to face mtg
-
Fri, July 11,2003
- NRL update (Sasha, Mark)
- EM calibration analysis
update
- Preparation for flight cde testing
- Recon info to Tracy (today, hopefully)
- LLR update (Berrie)
- Characterization of last layer correlation
- Bordeaux update (Benoit)
- CERN beam test prep
- GSI prep
- Other business
-
Fri June 6, 2003
- NRL update (Mark, Sasha)
- EM test data analysis
update
(Sasha)
- GCR calib/GSI planning (Mark, Benoit)
- LLR update and
update (Berrie)
-
Fri May,23, 2003
- NRL update (Sasha)
- LLR update (Berrie)
- Bordeaux update (Benoit)
-
Fri May,9, 2003
- NRL update (Sasha)
- LLR update (Berrie)
- Clustering tool (Gabriel)
- Bordeaux update (Benoit)
-
Fri Apr 25, 2003
- NRL
update (Sasha)
- LLR/Bordeaux update (Berrie)
-
Fri Apr 11, 2003 (Cen-A)
- NRL update (Sasha)'
- LLR update (Berrie)
- Bordeaux
update
(Benoit)
- SLAC update (Richard)
-
Fri Mar 14, 2003 (Cen-A)
- NRL update ( Sasha)
- LLR update (Gabriel)
- Bordeaux update (Benoit)
- SLAC
update
(Richard)
Fri Feb 28, 2003 (Cen-A)
- NRL update (Mark, Sasha)
- LLR update (Berrie)
- Bordeaux update (Benoit)
- SLAC update (Richard)
-
Fri Feb 14, 2003 (Cen-A)
-
Fri Jan 24, 2003
-
Fri Jan 17, 2003
- Recon studies (Berrie)
- Calibration update (Sasha)
- SLAC mtg agenda
-
Fri Jan 10, 2003 (Saturn)
Fri Dec 20, 2002 (Saturn)
- Calibration class review (Sasha)
- Recon studies (Berrie)
- SLAC update (Richard)
- Bordeaux update (Benoit)
- Meeting date (Mark)
-
Fri Dec 6, 2002 (Saturn)
-
Wed Nov 6, 2002 (Mars)
- SLAC Update (Richard)
- France Update (Berrie)
- NRL Update (Sasha)
Wed Oct 9, 2002 (Mars)
- NRL Update (Sasha)
- France Update (Berrie)
- SLAC Update (Richard)
- Performance Review Update (All)
-
Wed Oct 2, 2002 (Sun)
-
Wed Sep 25, 2002 (Venus)
- Recon parameter recalc update (Berrie, Richard)
- Interaction rate and energy scale studies (Richard)
- Recon update (Sasha)
- Low energy photons (Eduardo)
-
Wed Sep 4, 2002 (Venus)
- NRL update (Mark)
- CalDigi update (Richard)
- France update (Berrie, Gabriel)
-
Wed Aug 21, 2002 (Venus)
- CalDigi update (Richard)
- The MSU plot showing light taper is
here
- France Update (Berrie, Gabriel)
- High energy correction recalculation
- Cluster algorithm
- CAL tuple
quantities
- Software Requirements
- Mark's Aug/Sept/Oct schedule
-
Tues Aug 6, 2002 (Saturn)
-
Wed July 24, 2002 (Saturn)
- Discuss face to face mtg minutes
-
Thurs - Fri 18-19 July 2002 -- Face to Face Calorimeter Software Mtg @ NRL
-
Wed June 12, 2002 [CANCELED]
(Neptune)
- Doc review preparation status
- Cal Recon (Sasha)
- Cal Digi (Richard)
- Event (Richard, Sasha)
- Face to face meeting prep (Mark)
- Update on what will be done in France (Berrie)
-
Action items (Mark)
-
Wed June 5, 2002 (Moon)
- Doc review preparation status (Sasha)
- Face to face meeting schedule? (Mark)
- Recap of Analysis Group meeting (Mark)
- CAL software mtg schedule for next few weeks (Mark)
- Action Items (Mark)
-
Wed May 29, 2002 (Mars)
-
Wed May 22, 2002 (Moon)
- Cal S/W update (Sasha)
- CAL S/W code review (Mark, Sasha)
- Action Items
(review due dates) (Mark)
- Wed May 15, 2002 (Neptune)
- Calorimeter Calibration Database
update (Sasha)
- EGRET low energy "recon" technique (Berrie)
- Update on Root CAL Digis (Richard)
- Action Items
(sounds more official than "To do list" -- and they will have due dates
too!) (Mark)
-
Wed. May 8, 2002 (Moon)
Last Modified: M. Strickman
09/20/05 09:57